Feb. 2012 – Till Date: COMPACT MANIFOLD & ENERGY SERVICES LTD

PROJECT: Lift and Installation of Deck Extension to existing Tanker Mooring/Manifold Platform (Offshore)

CLIENT: Addax Petroleum Development Nigeria Limited

POSITION: Senior Planning/Controls Engineer

Senior Planning Engineer, Babcock Marine, Successor

START Date
  • Create and maintain P6 schedule programme using data from the MoD requirement, ensuring that the correct level of logic is incorporated to support the Programme Manager’s requirement.
  • Apply the FSMIPT Project Structure to all programmes incorporating logic & coding as required to deliver programme outputs.
  • Facilitate meetings with FSMIPT Heads of Department and Design and Safety Teams to actively collect progress information and updates of Primavera P6 work schedules.

Project Analyst (Intern), Diageo, Supply Chain and Growth

C
Chima Amadi 👤 Member for 14 years 2 months
START Date
END Date

 

RESPONSIBILITIES:

·      Analysed equipment’s fuel consumption and inventory control of Guinness engineering spares including all mechanical, electrical/ instrumentation spares such as: gas systems, compressed air and vacuum pumps, boilers and condenser, chillers, standby diesel generators,  building services; sanitation, sewage, potable water treatment plants, water distribution and electrical spares and instruments using Excel and ERP applications (MAXIMO, STRUXURE & SAP).

Assistant Site Engineer, Adano oil and gas, REVAMPING OF ATLAS COVE DEPOT FACILITIES:RECONSTR. OF PMS TANK 11 AND 21,DISMANTLIING ,RECONSTR. & REHAB. OF TANKS AT NNPC DEPOT

START Date
END Date

 3 years of experience: 1year training experience with PZ Nutricima, 1 year training  experience with DSC and added to Adano Engineering, and oil and gas.

 

Planning Assistant, Network Rail, King's Cross Redevelopment Programme

START Date
  • Preparing a project work breakdown structure and plan in accordance with the requirements of the Guide to Railway Investment Projects (GRIP)
  • Managing and monitoring progress to the plan and make changes as required. Develop recovery programme and contingency plans in order to meet changed objectives.
  • Report actual performance and variance against plan and forecast outcomes.