Planning & Scheduling

Planning Engineer, Chiyoda Foster Wheeler Co, OMAN LNG Plant

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Planning Engineer :Assist Chiyoda-Yokohama Project Control Team for finalizing Level III schedule for the submission to the client. At site, combined the Sub-Contractor’s schedule to prepare Level IV working schedule. Responsible for preparing Daily/Weekly/Monthly reports. Monitoring productivity, slippage of activities and reporting to the Controls Manager.

Schedule Controller, JGC Corporation, Upstream & Compression Facilities

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Compile sub-contractor’s data and prepare Daily, Weekly and Monthly reports (Progress, Manpower and Equipment). Take the physical progress and compare with the sub-contractor’s reports. Update progress in P3 (Level III & Level IV). Prepare 3 Month, 3 Weeks Look-Ahead Schedules and monitor the productivity. Take progress photos and prepare the reports in PDF format (Acrobat).

Schedule Controller, ECC, Infrastructure Projects

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Schedule Controller :Prepare schedule for new projects in Northern Iraq and implementing it. Responsible for preparing Daily / Weekly / Monthly reports, take physical progress and update the P3 schedule, based on the progress prepare invoice sheet for the client and subcontractor, monitor productivity, EVMS, CPA, EVA, slippage of activities and reporting to the Project  Manager. Prepare proposal schedules for the upcoming projects.Provide adequate training to nationals in Project Controls.

Sr. Planning Engineer, "ENI Oil, Libya", Onshore & Offshore Projects

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Projects: Offshore :  DP3/DP4 Revamping Project,Bouri Field Gas Utilization Project (Sealine System),Gas Recovery Module for Bouri Field Gas Utilization Project, Basic Design and FEED- Bouri Field Phase 2 Development Project, Bouri Sloug Replacement Project, Acid Reinjection Project and Water Reinjection Project .

Project Controls, EG LNG (Marathon Oil Company), Onshore & Offshore Projects

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Projects: Offshore :  Alba B Accommodations, Emergency Escape Bridge, Al B & B2 Fire & Gas Upgrade, Security Upgrades, Offshore Perimeter Surveillance Implementation. Onshore : Chemical Storage Warehouse, Malabo Dos, Overhead Gas Plant Integrated Project, Reliability Projects, Lightning Protection Project and Glycol Regeneration Project

Schedule Controller, ECC, Kabul Military Training Compound (KMTC)

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Schedule Controller :Prepares and manages overall master project schedule integrating the project Work Breakdown Structure. Coordinates schedule from multiple contractors and incorporate the information gathered into the overall project master schedule. Monitors and forecasts progress of activities in contractors’ work schedules. Highlight problem areas and recommend remedial actions.

Planning & Project Controls Manager, Black & Veatch, Kandahar Helmand Power Project (KHPP)

S
Sajan Kumar 👤 Member for 22 years 8 months
START Date
END Date

Project Controls Manager :Mobilized to Afghanistan as Field Project Controls Manager for scheduling, cost engineering, and estimating functions for $266M USAID Kandahar Helmand Power Program. Projects include transmissions lines, distribution systems, substations, new power generation facilities (diesel generators), and hydropower turbine installation. 

planning engineer, dual construction, industrial

START Date
END Date

1.    Utilizing special planning computer software (Primavera Project Planner & Enterprise).

2.     Prepares baseline program and schedule based on the most appropriate method and sequence of construction operations of the project.

3.    Monitor and prepare different progress and forecast reports as needed by the management and/or client/consultants. (E.g. Look Ahead Schedule, Recovery Program)

SENIOR PLANNING ENGINEER, FSB & DUAL, BRIDGES, ROADS, 1.Construction of Multistoried Buildings

START Date
END Date
  • PREPARATION OF BASELINE SCHDUELE WITH COST & RESOURCES LOADING
  • MONITORING THE PROJECT PROGRESS BY TRACKING IT BY QUANTITY/MANHOUR/COST UNITS
  • GENERATING REPORTS & CONDUCT WEEKLY PROGRESS MEETING
  • ADVISE PROJECT MANAGER/RELATED DEPT ABOUT SITE PROGRESS AND LOOK AHEAD ACTIVITIES
  • IDENTIFY AND INFORM EARLY TO CONCERN PERSONS ABOUT PROJECT DELAY, OBSTACLES
  • PREPARE EOT, RECOVERY PLAN IF NEEDED
  • GENERATING RESOURCES & COST MANAGEMENT REPORTS

Planning Engineer, DUAL CONSTRUCTION, 1.Construction of Multistoried Buildings, Bridges, Roads

START Date
END Date
  • PREPARATION OF BASELINE SCHDUELE WITH COST & RESOURCES LOADING
  • MONITORING THE PROJECT PROGRESS BY TRACKING IT BY QUANTITY/MANHOUR/COST UNITS
  • GENERATING REPORTS & CONDUCT WEEKLY PROGRESS MEETING
  • ADVISE PROJECT MANAGER/RELATED DEPT ABOUT SITE PROGRESS AND LOOK AHEAD ACTIVITIES
  • IDENTIFY AND INFORM EARLY TO CONCERN PERSONS ABOUT PROJECT DELAY, OBSTACLES
  • PREPARE EOT, RECOVERY PLAN IF NEEDED
  • GENERATING RESOURCES & COST MANAGEMENT REPORTS