Project Control Manager HOD, Saipem Indonesia, FLOATERS - FLNG
Project Control Manager Head of Department PT Saipem Indonesia
Project Control Manager Head of Department PT Saipem Indonesia
Senior Planning Engineer for ENI Angola, Operator on the Angola Block 15/06 East Hub (2,500 MUSD) project; to develop the Cabaca South East field, Lower Miocene system, which is located in 470m of water.
ADCOP marine oil pipe stringing project in Fujairah:
Construction sequencing and progress reporting of connection of steel pipe onshore to offshore PLEM.
Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation
Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor
Established the project setup (project coordination plan, project quality plan, schedule, and budget incl. CTR – Cost, Time & Resources); monitored and rectified the implementation (recovery plan, daily / weekly / monthly report, MOM, supervising document controllers); compiled technical documents, such as Scope of Work and Basis of Design; and handled commercial matters of the project (cost report, change order, level-4 cost estimate, and invoicing)