MS Suite 2)Planning and Scheduling ;Progress Reporting;

Project Planning & Project Control Engineer, EXPONENT ENGINEERS, HOZHU, MASCO, WARID TELECOM, Building, Oil Terminal, Sewage, Telecom, Water and Waste Water

START Date

Planning Engineer,

Major Responsibilites:

  • Preparing planning packages including WBS, all levels plan, prepared Critical path of the project.
  • Preparing master plan, base line plan , recovery plan, crush schedule,  and schedule for tender and insurance
  • Preparing Revnue cash flow , cost distribution and cash flow ‘S’ curve
  • Preparing resource loading, man power histogram and equipment list
  • Performing Earned value management for measuring project performances, cost analysis and future forecasts