Project Controls Specialist, Fluor Daniel SA, Project Turbo

START Date
END Date

Employed as lead planner reporting to Project controls manager.
Overseeing of construction contracts for civil works, under ground services, structural steelwork, field fabricated tanks and the construction of a new cooling water tower.
Review and compilation of submitted Compensation events for Project managers assessments and Early warning matters as required by the NEC.
Progress monitoring, Issuing of Early warnings to Contractors and Employer.
Contractor interfacing and scheduling of early requirements.
Conversion of work package based schedule to a systems structured han

Planning Lead, Shell Petroleum Development Company of Nigeria, SODA/ DomGas Project

START Date
END Date

I have been engaged in planning for 21 years dealing with production through multi disciplinary projects, from inception through commissioning. My career has progressed from the shop floor (Boilermaker) to the current post of Planning Lead. Experience has been gained in production, power generation, process plant, petro-chemical, aluminium smelting, breweries, Copper mining, covering all disciplines. Currently I form part of the Owners team, based in Warri, Nigeria. Present project portfolio totals some US $5 Billion, ranging from Flow stations through to Central Processing Plants.

PLANNING ENGINEER, QGC, AMEC, PLUS THREE CONSULTANTS, TURNER & TOWNSEND, SANTOS, GLNG, QCLNG,

START Date

Project Planning for Client and Contractor from FEED thru EPC construction including EOT (forensic claim planning).

Started with Infrastructure and Building industry for a collective 5 years and 10 years in Oil & Gas /Petro-Chem industry.

Project Controls Manager, Planning Manager, Senior Planner, Fluor, Bechtel, KBR, MWKellogg, Bantrel, Amec. Suncor, Syncrude, Parsons, Foster Wheeler and other companies, Shell GTL Project, Ras Laffan, Qatar

START Date

Initial career as Architectural Designer in the office during formative years has led to a thorough grounding in the dynamics of the EPC work process. Held positions with notable national and international EPC firms, Contractors and Owners in foreign and domestic environments.

Planning Manager, AMEC, Sub Surface Lines Power Upgrade

START Date
END Date

Planning & Reporting Manager on Power Upgrade Project for Amec

 

  • Negotiated with client to create new SSL Scoping & Development programme to facilitate requirements of MPD, EV and period reporting.
  • Managed production of Design & Build programmes for client to use in ITT successfully recovering lost time in the delivery milestone.
  • Improved relationship between client & contractor.
  • Managed a team of ten planner

Lead Planning Engineer, Metronet Alliance, London Underground PPP

START Date
END Date

Lead Planner on Stations East Projects for Metronet Alliance

 

  • Reported programme status for stations in the East of London to the Senior Management team outlining key issues, maintaining a strict focus on delivery.
  • Managed a team of sixteen planners, meeting periodically to get an understanding of the key issues and mitigation measures taking place on the projects.
  • Working with QS fully cost loaded programmes to activity level to ensure accur

Senior Site Planner, Group Five Coastal, Khayelitsha Hospital, Cape Town

START Date
END Date

Worked as the senoir site planner at Khayelitsha Hospital. Was responsible for all planning functions, which included the contract program, short term programs, progress updates, progress reports, information control, all technical queries, formwork scheduling etc.

Senior Planning Engineer, ETA ASCON, High rise Buildings

START Date
END Date
Experience Hours (Planning & Scheduling)
10000
Experience Hours (Cost Management)
7550
Experience Hours (Forensic Analysis)
3050

Current Role

Project Planning & Management

§  Preparation & Monitoring of Construction Master Programme.

§  Scheduling project including material & manpower planning.

§  Anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.

Construction Planner, AL Habtoor - Leighton Group, Iris Bay Tower

START Date

Project: Iris Bay Tower  

Briefing: 3B+GF+4P+36+Roof - Sh.Zayed road, Business Bay.

 

Job Description:  

• Preparation of the weekly, monthly and coordination meeting reports. • Updating the program as per the actual progress on site, and retrieve percentages of planned and actual progress.

• Developed Extension of Time Programs and Contract Documentation for claims as per project requirements.

• Instrumental in contract documentation related to contractual issues, claims, delays and impact analysis, etc.