Develop project baselines ; monitor and control projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of the assignments
Administer overall management of Planning Department of UAE Business Unit; prepare EOTs for all the projects under UAE Division
Take care of the Planning Department with team of over 30 Engineers entailing Planning Managers, Senior Planning Engineers, Planning Engineers and Junior Planning Engineers
Review designs, drawings, specifications, BOQ & modifications required to
Develop project baselines ; monitor and control projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of the assignments
Administer overall management of Planning Department of UAE Business Unit; prepare EOTs for all the projects under UAE Division
Take care of the Planning Department with team of over 30 Engineers entailing Planning Managers, Senior Planning Engineers, Planning Engineers and Junior Planning Engineers
Review designs, drawings, specifications, BOQ & modifications required to
A short less than 1 year stay with FMC Technologies, the No.1 Most Admired Equipment O&G Company. Having global offices in Houston, Norway, Brazil, Singapore.
During this time,
1. Exposed to Subsea Equipment. Totally different from my topside construction experience
2. Exposed to Manufacturing planning methods from project standpoint.
3. Teach engineers how to read schedules, especially usnig floats as a guide.
4. In-depth understading of the constraints and right application.
Currently a project planner within the engineering/ design department at Bombardier Transportation (rolling stock and systems integrator) train design and manufacturing company. Developing programmes to deliver the design/engineering of rail vehicles usually to very tight timeframes. Manage programme for engineering team for the LERL project for new vehicles to operate from Stansted. This project was a significant amount of man hours and a two year duration from project start to first vehicle into service. This project was successfully delivered on time.