Site Planner, Shin Eversendai Engineering, 1 X 1000 MW Coal Fired Supercritical Boiler

START Date

 

Project: 1 X 1000 MW Coal fired Supercritical Boiler

• Implementing and supervision of mill, pulverizer and boiler installation for Power Plants of capacity 1000 MW.

• To ensure planning, scheduling & timely execution of all Mechanical Erection & Commissioning related work of 1 X 1000 MW Power Project at site.

• Good knowledge of boiler components, including pressure parts, pre assembly, structure erection of Heavy equipment with specific experience of preparation of lifting plan.

Mechanical engineer/planning Engineer, Ozono Nigeria Limited/ Shell Petroleum Development Company Nigeria Limited, Piping Design/ Environmental Upgrade of Various Flowstations

START Date
END Date
Experience Hours (Planning & Scheduling)
600

- Participated in draughting and checking of engineering jobs

- Design of pipelines

- Planned with Microsoft Project

- Involved in collection of data from the field

- Coordinated safety meetings