analysis

Project Manager, BAE SYSTEMS (SUBMARINES), Maritime Solutions

START Date
Experience Hours (Planning & Scheduling)
20000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
5000

Over 25 years experience in Planning, scheduling, risk management, SRA and more recently Forensic Analysis and Metric reporting. Role presently involves the evaluation of EVM software and its implementation.

Senior Planner / Director, Right First Time Planning Services Limited, Automotive, Construction, Production, Rail

START Date
Experience Hours (Planning & Scheduling)
27600
Experience Hours (Cost Management)
2650
Experience Hours (Forensic Analysis)
2750

Senior Planning Engineer I am the senior planner on a £114 million upgrade to improve the River Ribble estuary and the coastal environment flood defence project on behalf of United Utilities. This involves building a 3.5 km long storm water storage tunnel in the Preston and Penwortham areas. This will bring significant environmental improvements to the Fylde coast bathing waters and designated shellfish beds located within the Ribble Estuary.

Senior Project/Program Planner, Iberdrola Engineering&Construction (Scottish Power), Portfolio of Network projects including substation, Overhead Line and U/G Cabling

START Date
END Date
Experience Hours (Planning & Scheduling)
4000

·         Develop, maintain, monitor and update a multiproject program including Substation and Over head line (OHL) projects

·         Create rolled-up programmes and reports due to the nature of the job (up to 25 projects)

Type 45 Planning Manager, BVT Surface Ship Solutions, Type 45

J
John Banks 👤 Member for 18 years 11 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
500

Line management responsibility for twelve staff, locations splits between Glasgow (two sites) and Bristol

Manage and maintain T45 programme suite of plans, level 0 to level 2 shipbuild, plus cost control account programming

Key MOD point of contact for all planning queries and activities

Facilitate integration of level 3 to level 2 plans

Selecting new planners to business at interview

What-if analysis and risk mitigation options of all plans level 2 and up

Redesign of WBS, PBS, OBS, and RBS to simplify and set as group standard

Project Scheduler, APA-Group, Gas Infrastructure

C
Craig Adams 👤 Member for 14 years 5 months
START Date
Experience Hours (Planning & Scheduling)
20000
Experience Hours (Forensic Analysis)
4000

Preparing schedules for new projects, assisting with contractor scrutiny during tender submissions, reviewing schedules for extension of time claims, providing support to PM's on scheduling matters.

Preparing monthly reports for Steering committee.

Being everyone's Bitch - I also help out with construction management and supervision.

Trying to convince people to use a decent scheduling tool like Asta or TILOS, some still think the world is flat!

Project Management, Multiple, Multiple - Consulting Planner

START Date
END Date
Experience Hours (Planning & Scheduling)
20500
Experience Hours (Cost Management)
10000

Enterprise Project Management consulting for 29 years for many clients including Raytheon, Texas Instruments, Petrobras, McAfee, Whitney Bank, Chase Bank, and Centura Bank.

Lead Scheduler, Gray Research, Missile Defense

START Date

Started scheduling with CPM in 1985 (manually).  Started software scheduling in 1987 with Artemis with some small experience with Open Plan.  Began using MS Project in 1997 moving thru each of the versions - 2000, 2003, 2007, and now 2010.  Also have experience with AMS Real Time Project (also known as RTP).

I have worked on schedules a small as 10 tasks to as many as 64,000.  The past few years I have been a part of a proposal team where I created the IMS for the proporsal.  This past year I moved to another job where I evaluate subcontractor schedules (MS

Lead Planner and Package Planner, Black & Veatch, Kusile Power Station

P
Paul McCool 👤 Member for 17 years 8 months
START Date
END Date

Current Role - Package Planner on Eskom Kusile Power Station in South Africa.  Employed by Black & Veatch.  Project consists of 6x800MW coal-fired units and all BOP elements on a green field site.

Interfaces with Construction and Commercial management staff and with the Controls and Instrumentation contractor.  Reviews contractor programmes, providing feedback to contractor and reporting status to Project.  Develops and inputs logic and status updates for Project Master Programme.  Provides reports and analysis for Project and corporate management.&