Study the contract documents and understand the nature of the job along with start date and end date.
Review the IFC drawings along with the PE for an understanding of the scope of works.
Prepare the project charter and study the BOQ for program preparation
Prepare the works program (WP) along with cost and labor loaded in discussion with PE,PM and Higher level management in 14 days from the date of receiving the main contractor program, and follow up main contractor for the approved program and should u
Study the contract documents and understand the nature of the job along with start date and end date.
Review the IFC drawings along with the PE for an understanding of the scope of works.
Prepare the project charter and study the BOQ for program preparation
Prepare the works program (WP) along with cost and labor loaded in discussion with PE,PM and Higher level management in 14 days from the date of receiving the main contractor program, and follow up main contractor for the approved program and should u
Study the contract documents and understand the nature of the job along with start date and end date.
Review the IFC drawings along with the PE for an understanding of the scope of works.
Prepare the project charter and study the BOQ for program preparation
Prepare the works program (WP) along with cost and labor loaded in discussion with PE,PM and Higher level management in 14 days from the date of receiving the main contractor program, and follow up main contractor for the approved program and should u
Senior Site Planner for Amec building New extension and full exisiting structure refurbishment of Paisley Council HQ (Value £40) Responsible for all planning duties including progress reporting and short term target planning Assisting Commercial department with procurement and delay analysis
Notifying project changes to the planning manager through the Reports with time analysis (deadline) current timeline x Baseline;Analysis of HH Index and consumed and allocated Material to accomplish the scheduled weekly Work packages;Submission of weekly scheduling of work packages to be executed;Updating and rescheduling activities on the current timeline;Impacts analysis due to the rescheduling of work packages in Project conclusion;Generate critical project path report;Action Plan study for the implementation of the proj
Supervision of schedules of engineering stages, bidding, supply, Construction, electromechanical assembly and commissioning;Time Analysis (deadline)-Enterprise physical timeline advancement Builder x Baseline Timeline of management.Elaboration and timeline control of engineering stages, Bidding, supply, Civil, electromechanical assembly and Commissioning;Elaboration of Time Deviation report (deadline) Physical advancement Physical timeline of the company builder x timeline Baselinemanagement;Scope analysis (inclusion/exclusion) study
Notifying the commissioning team the released engines for testing of Cables Continuity (Electric room x field); Physical infrastructure, Advancement Report, cable launch; Connecting cables in motors and instruments, Assembling Electrical equipments and instruments;Critical Path Analysis – Interface between the phases of Civil construction, Mechanical, electrical, instrumentation, automation and commissioning;Issuance and Upload Check-List electrical assembly of motors, panels and Instruments in the system Pims completion Valpro;Issuance of Labor histogram.
Engineering Project Management (adjustments to the Plant safety systems, automation of Chocolate production lines.Issuing managerial report (Curve S) with physical progress information of the projects, WBS Physical x Financial * Elaboration and timeline control of the stages of Civil construction, electromechanical assembly, instrumentation, automationand Commissioning; Elaboration of time-deviation report (Term) Physical advancement Physical timeline of the construction company x managerial Baseline Schedule; * Scope analysis (inclusi