Lead Scheduler, Jacobs Engineering Group, Port of Miami Tunnel
Develop, adapt and maintain a resource-loaded schedule for the Port of Miami Tunnel – a $620 million Design-Build PPP project. The engineering design effort includes studies, reports, permitting, civil engineering, structures, architectural, and MEP components.