Canada (NA.CA)

CA

Planner / Scheduler / Cost Controller, Canadian Natural Resources Limited, Ledcor, University of Alberta, MDS, Oil and Gas

START Date

Professional Since 1998

M.Eng Construction Engineering and Management

Project Management Professional Certified

Director AACEI Norther Lights Chapter 2008 to 2009

Project Planning & Project Control Engineer, EXPONENT ENGINEERS, HOZHU, MASCO, WARID TELECOM, Building, Oil Terminal, Sewage, Telecom, Water and Waste Water

START Date

Planning Engineer,

Major Responsibilites:

  • Preparing planning packages including WBS, all levels plan, prepared Critical path of the project.
  • Preparing master plan, base line plan , recovery plan, crush schedule,  and schedule for tender and insurance
  • Preparing Revnue cash flow , cost distribution and cash flow ‘S’ curve
  • Preparing resource loading, man power histogram and equipment list
  • Performing Earned value management for measuring project performances, cost analysis and future forecasts

Doy Tampon

D
Doy Tampon 👤 Member for 14 years 11 months
First Name
Doy
Last Name
Tampon
Professional Since
Oldest experience
Years Experience
0
Telephone Number
+63915-4006314

Project Controls Staff in an Oil & Gas and Petrochemical Construction Industry. Perform schedule update using Primavera Project Planner (P3). Prepare planned S-curves, bar chart schedules. Set-up databases for tracking physical progress and invoicing formats in compliance with client’s requirements and contract provision.

About 4 years experience in the field of drafting and modeling (primitive and surfacing) using Unigraphics (UG) NX3. Has strong desire to succeed and achieve goals. Quick to accept and adapt to new responsibilities. Motivated and enthusiastic.

Project Scheduler, maloney industries, FABRICATION OF EQUIPMENT AND STRUCTURES FOR OIL FACILITIES

START Date

I have over 5 years experience scheduling for gas & oil fabrication shop.

2 1/2 yrs experience scheduling in P3

2 1/2 yrs experience  scheduling in P5

6 months experience scheduling in P6