AW
Aruba (NA.AW)
Serge Thijsen
Serge Ivar Thijsen was born on January 2nd 1978 in Aruba as the second son of Aruban parents. In 1990 he finished Primary school and in 1994 he obtained his M.A.V.O. diploma. After one year of H.A.V.O. he switched to M.T.S. where he succeeded in his Associate Degree in Construction Engineering in 1999. During his practical year at M.T.S. he worked for three months with the construction company Arcon N.V. He also practiced with Wilma N.V. a land surveying company for 4 months and lastly (3 months) with S.H.S. Design, an architect office.
STARCON Project Controls Manager
Divisional Cost Control Manager, San Nicolas, Aruba
Directed 11 team members responsible for in-house application operation, maintenance of IT systems, and numerous accounting duties. Tracked and analyzed multimillion dollar grass-roots and turnaround projects executed under arduous conditions.
Senior Cost Control Engineer, Manhattan, IL
SUPERVISOR - PROJECTS & TURNAROUND PLANNING SECTION, Valero, Valero Aruba 3 yrs T/A and Capital Projects upgrades refinery from 80,000bbls to 180,000bls/day
MATERIAL COORDINATOR/PLANNER TURNAROUND: Cost Controller, Material Planning and Scheduling for Turnaround. Several Turnarounds and Emergency Shutdowns (for about 60 MMUS$/yr and 900,000 Mhr/ Year) of Crude units, Hydrogen units, Hydrotreater units, Delayed Coker Units, Flare systems, Kerosene unit, Sulphur units, Package Boilers, Turbo Generators, Desalination units and Visbreaker/Vacuum Flasher unit.
Cost Estimator, PMEC, Refinery Wide Cost Estimator
Turnaround Planner/Scheduler and Cost Estimator, Can develop bid packeges and contract negociations plus much more.
Senior Planner Scheduler, Thijsen Engineering & Consultancy N.V. & Valero, Turnaround projects, Maintenance Project & Refinery Restart Projects
-
Recently I've developed a multivariable control strategy for scheduling control at the Valero Aruba Refinery by setting up the project management tool Primavera P4 program for planning and scheduling standardization, using project codes, activity codes, Refinery resources, layouts and reports. Through these efforts the scheduler can schedule its project in a timely matter and customize any type of reports before, during and after a Turnaround or Project for field execution team or management team.
-
Valero Planner
Current Role
Pagination
- Page 1
- Next page