Qatar (AS.QA)

QA

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

Continues Employment contract with ASCO Qatar till present.

Project: Abu Hamour Surface & Ground Water Drainage Tunnel Phase 1, was design and construction of 9.5 kilometre long and 3.7 meter pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also included 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Lead/Senior Planning Engineer, CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1,

START Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

PLANNING & COST ENGINEER, NEW HORIZON, Roads & Utilities project

START Date
END Date
Experience Hours (Planning & Scheduling)
7000
Experience Hours (Cost Management)
2800

·         Performs control of all relevant engineering documentation from conceptual to closeout as well as provision of planning and cost reports.

·         Prepares various technical reports as required during the design process.

·         Performs project coordination and attends progress coordination meetings.

Ajimir Ismail

First Name
Ajimir
Last Name
Ismail
Professional Since
Oldest experience
Years Experience
5
Guild Accreditation
Awaiting Applicant
GPC Pilot Tester
Telephone Number
+97470994204
LinkedIn Profile
https://www.linkedin.com/in/ajmeer-ismail

I'm a planning engineer working in an infrastructure sector (Roads & Utilities) for more than 6 years with a key skills of progress measurement, EOT preparation and claim, and delay analysis. 

SENIOR Planning & Scheduling Engineer, QStech, POLYSILICON PROJECT

E
Eslam Awad 👤 Member for 14 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
0

q   Establishing and maintaining the Project WBS

q   Establishing and maintaining the Integrated Project Master Schedule

q   Integrating the Baseline Schedules from all Project stakeholders

q  Issuing and updating the Integrated Control Schedule

q  Progress Monitoring and Measurement

q  Project Progress Measurement (baseline versus actual versus forecast)

Construction Project Planner / Senior Planner, Permasteelisa Qartner Qatar, NDIA- New Doha International Airport- Terminal Complex Lounges

START Date
Experience Hours (Planning & Scheduling)
22200

 -  Prepares baseline program with coordination from technical and project manager.

 -  Prepares manpower/equipment histogram and progress s-curve.

 -  Direct & supervise junior planners in preparing progress monitoring/reports.

 -  Prepares schedule impact analysis.

 -  Prepares contractual progress report.