Lead Planner

Primary Role & Responsibilities:

     In-charge For Over All Project Control, Monitoring & Projects Reports For Engineering Departments Over All Projects.

     Reviewing and approving contractor’s work planning package

     Review & Approved Contractor request for EOT by TIA.

     Create & Develop Constructions Master Programme. That Includes Generation of milestones in the construction stage for inclusion in tender documents via detailed discussions with the Design Manager, Design Team, and other participants.

Planning Manager, Al Habtoor Engineering Enterprises, City Centre Expansion Project

START Date
END Date

Construction of 5 Towers of 54 Storeys each in Doha, Qatar
JOB DESCRIPTION:
•Prepare Clause 14 Programme of Works in Primavera P3 or P6 formats.
•Supervises planning engineers in weekly updates of the construction progress and prepares construction updated schedules using Primavera Project Planner.
•Monitor actual accomplishment in reference to the contractual Clause 14 P3 Program and or Balance-to-Complete P6 Programme.
•Liaise with Project Manager and formulate strategies in order to meet his target program.
•Manages sub-contractors schedules, resources and updates.

Senior Planner / Senior Planning Engineer, AL JABER TRADING AND CONTRACTING COMPANY, New Doha International Airport project; Managed by Overseas Bechtel

START Date

Working as Senior Planning Engineer

Major Works for Baseline Schedule, Revised Schedule & Recovery Schedule

Review the contract documents, BOQ, Drawings and prepare the Master schedule as per project requirement and by assigning Project Calendar, creating required WBS, RBS, CBS- Cost Account and loaded with Resources, Cost.

Submission & Approval of the Master Schedule to Client / Consultant

PLANNING ENGINEER,3 Years, ETA - M & E Division, Barwa City

START Date

Current Role

  1. ProjectExecution Planning Level 3 & Level 4, Material, Procurement & Shop Drawing Production Planning
  2. Decision and Risk Analysis (D &RA)
  3. Creating Baseline Contract Programme
  4. Critical path method (CPM) analysis, variance analyses, floats analysis and schedule trending.
  5. Schedule development, management and change control, claim defense, engineering and construction methods, commissioning and start up planning, critical path and trending analysis and high profile presentations.
  6. Producing Level 2 Tender Pr