PLANNING ENGINEER, L & T , SALALAH INTERNATIONAL AIRPORT PROJECT, OMAN

START Date

Roles & Responsibilities:

  • Thorough study of the contract documents / drawings to prepare a Master Plan / Schedule for the project using PRIMAVERA (P6/P3) within the given budget, manpower and time limits using CRITICAL PATH METHOD.
  • Resource Loading / Leveling.
  • Getting the Master plan approved.
  • Updating the progress every week and comparing it against the Master plan / Target for submission to the client / consultant and to the management (Through “S-Curve”).
  • Prepara

Planning Engineer, Galfar Engineering %26 Contracting SAOG, Galfar Al Misnad Engg & contracting WLL, Design and Construction of road in Mahdah region, Upgrading and Construction of Roads in Messaied Community Area- Qatar, Ground Water Recharge Dam - Oman

A
Amit Jog 👤 Member for 21 years 8 months
START Date
END Date

 

Preparing the Baseline programme of works including resource loading and cost loading.

Updating the programme biweekly/monthly basis.

Schedule finalization, resource mobilization, exercising control over work and achieving project within schedule and budget.

Budgeting, preparation of cash flow, cost control, coordination with Head office finance and material dept.

Preparing the business plan for the project.

Vetri Selvan

First Name
Vetri
Last Name
Selvan
Professional Since
Years Experience
0
Telephone Number
968-94310969
LinkedIn Profile
https://om.linkedin.com/pub/vetri-selvan-m/15/9a6/55a

Sr. Planning Engineer, Carillion Alawi LLC, 2x60MW Thermal Power Plant, Infrastructure Building (Parliament Building)

L
Lalit Bawne 👤 Member for 15 years 8 months
START Date
END Date

Summary

Experience in Power Plants, & Infrastructure Building Projects.
Experience in Project Management; Quantity & Cost Estimation, Proposal & Analysis.
Technically sound in Primavera 3.1 & 6 version, MS Project 2007,AutoCAD & STAAD PRO, Asta Powerprojects, MS Office 2007.
A versatile communicator and possess abilities in leading and building a team.
High-end satisfaction level and hard working for achieving quality results.

Senior Planning & Cost Control, Oil & Gas Exploration and Drilling, OIL AND GAS VARIOUS PROJECTS (HEADOFFICE POSITION)

START Date
  • Experience in Project Controls, Planning& Coordination of Project Activities. Develop & maintain Project Base line & Current Schedules for multiple Projects. Measure progress on Project Schedule as part of status update. Analyse Schedule for critical path and Schedule risk. Produce recovery Schedules as required by Project Management Team.