Engineer, Taylor Woodrow, Various
Engineer responsible for construction and, later, planning activities on various projects.
GB
Engineer responsible for construction and, later, planning activities on various projects.
Risk manager for net work rail
Enterprise project structure
Organisation brake down structure
I am having really bad experience with this website. I have a profile! You want to collect all this valuable information on me before I can use the site. Nonsense. May stop using it alltogether.
I am working for Nuclear New Build (NNB) project in UK. My role is a Project Scheduling Engineer mainly responsible for Commissioning and Pre-Operations schedules. The scheduling software used is Primavera P6. I occasionally use MS Project as well (sometimes I do receive a draft schedule in MS Project from colleagues in non-scheduling department to work on).
Currently Construction Planner for Balfour Beatty Rail (track partnership project)
Job Working closely with the delivery team of each individual weekend possession (both Drainage and Ballast and Track renewals). By collating and studying all their current information on the specific job, I have the ability to challenge the logistics of the work and summarise the job in a detailed P6 (Primavera) programme.
Currently Construction Planner for Balfour Beatty Rail (track partnership project)
Job Working closely with the delivery team of each individual weekend possession (both Drainage and Ballast and Track renewals). By collating and studying all their current information on the specific job, I have the ability to challenge the logistics of the work and summarise the job in a detailed P6 (Primavera) programme.