Foster Wheeler Energy UK Senior Project Planner

Senior Planning Engineer working within the Offsite & Utilities Team for the Detail Design of IOCL Paradip Refinery. Having developed the Level 2 schedules within Milestones and expanded them to form the Level 3 schedules on Primavera P6 These were updated monthly to determine the status of the project. Overall progress was calculated through the Drawing & Document Control Package.

I then developed the Level 3 Construction Schedule for the Offsites & Utilities which was passed to the Indian Office for further detailing.


SLP Engineering Project Planning Engineer

Working as Project Planning Engineer on the Shell Carrick & Clipper Project. This involved the fabrication of 2 new Topsides for the Southern North Sea with their Jackets and 2 Bridges. Preparation of and monitoring against the initial Schedule in Artemis 9000, and the further development detailing out the Fabrication, Erection & Outfitting. Including the integration of the Instrument Subcontractor Schedules.