petrofac Planning Engineer
Preparing Schedules for Bid Documents which included the development of onshore oil fields in Turkmenistan and an offshore facility off Spain.
GB
Preparing Schedules for Bid Documents which included the development of onshore oil fields in Turkmenistan and an offshore facility off Spain.
Responsible for the development of the Project Network to encompass the growth in scope of the Engineering works for the Esso Balder FPSO prior to the issue of "Work Packs" to UIE for modification & rectification work being carried out.
Senior Planning Engineer working within the Offsite & Utilities Team for the Detail Design of IOCL Paradip Refinery. Having developed the Level 2 schedules within Milestones and expanded them to form the Level 3 schedules on Primavera P6 These were updated monthly to determine the status of the project. Overall progress was calculated through the Drawing & Document Control Package.
I then developed the Level 3 Construction Schedule for the Offsites & Utilities which was passed to the Indian Office for further detailing.
Senior Planning Engineer detailing out the Construction Schedule for the Bouri GRM Project and reviewing the Variation Orders for schedule impact. Primavera P3 was initially used converting to P6.
Production of documentation and schedules in preparation for the arrival of the bid documentation for PEMEX Accommodation Units. Systems Used: P3, Microsoft Project
Working as Project Planning Engineer on the Shell Carrick & Clipper Project. This involved the fabrication of 2 new Topsides for the Southern North Sea with their Jackets and 2 Bridges. Preparation of and monitoring against the initial Schedule in Artemis 9000, and the further development detailing out the Fabrication, Erection & Outfitting. Including the integration of the Instrument Subcontractor Schedules.
Lead Planning Engineer working on the FEED for South Pars Development Phs 6, 7 & 8. Responsible to the Project Controls Manager for the production of weekly progress and input to the monthly reports. Working Closely with Instrument & Telecoms Design Engineers for input to Schedule. Using Primavera P3
Responsible to the Project Manager for the development of the Contract Network to reflect the current construction logic for The Shell Ketch Project. The development of progress cost and productivity curves to monitor the project, and production of the Weekly & Monthly Reports.
Responsible to the Outage Manager of Sizewell A Power Station, initially, for the review of the current outage Planning routines and recommendations for improvements, with the aim of reducing the outage periods by the use of better controls.
Initially responsible for all Planning input to a tender for modifications to the onshore terminal at Bacton Norfolk. Subsequently asked to fulfil all Planning functions throughout the Company,