Forensic Delay Analyst, BALFOUR BEATTY, East London Line
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
GB
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
Design Team Member for preparation of Design and Build Invitation to Tender documents for the depots expansion onto previously contaminated land.
R
Design of improvement works to 13 stations west of Paddington that will become part of the Crossrail route. Assistant Planner resource loading the AECOM project schedule in Primavera P6.
The Northern Hub Programme will improve rail services and enhance network capability throughout NW England by providing improved journey times and greater connectivity through Manchester city centre and towards its airport.
AECOM was commissioned to undertake a feasibility study investigating re-opening of 4 miles of the Gaerwen to Amlwch branch line in Anglesey, Wales; Out Of Use for 17 years.
Design management/ co-ordination and design (preliminary, detailed and construction) of conversion of Oldham to Rochdale Line heavy rail stations to modular tram stops, responsible for:
Operational and maintenance cost model for Contractor bidding for 36 year concession (€92m).
Feasibility study for how step free access could be achieved at 35 stations spread over London, managed by six Train Operating Companies (TOCs). The work was commissioned to inform station prioritisation for funding from the Department for Transport (DfT).