Planner, Shell, Various Maintenance Projects

START Date
END Date
  • Amec Process & Energy, City Gates, Nigg, Aberdeen (Theddlethorpe based) Aug 95 – Oct 99
  • Shell Operating Co. P.D.O. PO Box 81, Muscat 113, Sultanate of Oman June 1993 - July 1995
  • Shell (UK) Expro, PO Box 4, Lake Lothing Depot, Lowestoft, Suffolk. April 1990 - May 1993
  • S.L.P. Engineering Ltd, Hamilton Rd, Lowestoft, Suffolk. April 1989 - March 1990
  • S.L.P. Engineering Ltd, Hamilton Rd, Lowestoft, Suffolk. August 1980 - October 1982

Project Planner , Fabricom Contracting Ltd, Boston Massachusetts Utilities - Distrigas LNG distribution module

START Date
END Date
  • Develop from the contractual programme a working level 4 programme for the civil, equipment installation, cable installation and pre-commissioning work (Static Var Compensators, Harmonic Filters, Unisafe 22kV Switchgear) at 7 bulk load sites around the LUL rail network.
  • Liaise with ABB Sweden, Alfreton, and Ellesmere Port on the delivery and Factory Acceptance Test dates.
  • Weekly site visits to review and collaborate progress and attend site vendor meetings.
  • Produce progress reports to the client as per period payment profiles.
  • At completion of installati

Project Planner , London Underground Limited, Northern Line Upgrade Project

START Date
END Date

Project Planner on a Private Finance Project to install Power Quality Equipment to the value of £65 Million for London Underground Limited (LUL) as part of a variance to the Northern Line Upgrade project.

Project Planner, Fabricom Contracting Ltd, ICHP Auxiliary Boiler Installation

START Date
END Date

ICHP Auxiliary Boiler Installation with associated ductwork, steelwork and pipe work.

  •  Develop installation programme for ductwork, steelwork access and pipe work for two Auxiliary Boilers for client Foster Wheeler.
  • Project Engineer pipe work erection packs, pipe support requirements and progress tracking documentation.

Saturate Gas Plant £8 million rebuild, managed by Fluor Limited for Conoco Limited’s Humber Oil Refinery.

Lead Project Planner, Mitsui Babcock, ConocoPhillips Humber Refinery, No.3 Reformer Project

START Date
END Date
  • To develop, interpret, operate and monitor all relevant programmes for the Mitsui Babcock site team such that the contract can be controlled within budget and duration.
  • To produce all necessary programmes to reflect the overall contract requirements, ensuring all site engineers are advised of the contract key dates to be achieved and are being routinely monitored.
  • To liaise with the Client to record progress and establish reporting procedures throughout the contract duration enabling accurate progress claims to be submitted.
  • To ensure that progress is monitored

Lead Project Planner, Mitsui Babcock, Total Lindsey Oil Refinery, Stage 3/4 T & I HFA Shutdown

START Date
END Date
  • Prepare resourced shutdown programme from client SAP generated work orders (WO).
  • Update & maintain WO database and all associated WO documentation.
  • Produce progress ‘S’ curves and resource histograms.
  • To liaise with client on all aspects of work pack development and approval.

Lead Project Planner, Fabricom Contracting Ltd, Offsite Projects

START Date
END Date
  • Review and update all project fabrication scope utilising in house resources and facilities to enable management to maintain staffing continuity and production efficiency.
  • Maintain & update fabrication progress for offsite projects at ConocoPhillips Humber Refinery and UK Interconnector at Bacton.
  • Review and Develop level 2 programs for Tender Work along with projected resourcing levels.
  • Review and develop program, all planning progress trackers and contractual documentation for ConocoPhillips VOC Recovery Project, Teesside.

Framework Planner for ByzakEntec, AMEC, Yorkshire Water Medium Treatment Stream

D
David Gray 👤 Member for 18 years 1 month
START Date

Working as part of the BZE joint venture on the Medium Treatment Stream, providing cost and programming services to both Byzak and Yorkshire Water Services. Acting as lead programme planner for BZE developing cost and programme reporting systems, providing monthly programme progress updates, expenditure forecasts and earned value analysis. Managing a small team, providing training in Microsoft Project to Batch Managers and other team members. Co-ordinating with internal design teams, site managers and others to produce programmes and monthly progress updates.