United Kingdom (EU.UK)

GB

Senior Planning Engineer, KBR, (various projects)

START Date

JUL 2012 – Present KBR
LEATHERHEAD, SURREY
Senior Planning Engineer
Shah Deniz 2 Project - Responsible for the development of Level 2 schedules and detailed Level 4 schedules in Primavera for the two offshore platforms covering the detailed design phase of this project.

OCT 2011 – JUN 2012 M. W. KELLOGG Ltd (KBR),
GREENFORD, MIDDLESEX
Senior Planning Engineer
KEP Post 2010 – Responsible for the preparation and progressing of a Primavera P6 schedule for the post construction engineering for the KEP 2010 Upgrade.

Senior Planning Engineer, KBR, (various projects)

START Date

JUL 2012 – Present KBR
LEATHERHEAD, SURREY
Senior Planning Engineer
Shah Deniz 2 Project - Responsible for the development of Level 2 schedules and detailed Level 4 schedules in Primavera for the two offshore platforms covering the detailed design phase of this project.

OCT 2011 – JUN 2012 M. W. KELLOGG Ltd (KBR),
GREENFORD, MIDDLESEX
Senior Planning Engineer
KEP Post 2010 – Responsible for the preparation and progressing of a Primavera P6 schedule for the post construction engineering for the KEP 2010 Upgrade.

Planner / Project Controller, Jacobs Engineering, B30 Waste Retrievals

START Date

I currently work for Jacobs Engineering where I completed my apprenticeship in Project Controls in September of last year.  During the first year of my apprenticeship I was situated at NETA Training.  During this year I studied project control principles.  Alongside learning these principles I ran a simulated project as part of a team, which took me through the whole project life cycle.  After this I was situated in the Stockton office of Jacobs (formally Aker Solutions).  During this period I rotated around four project control departments.