EU.UK.UK_SE
UK-South East (Region)
Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment
2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.
Rebecca Keegan
An Achievement focused individual able to work under pressure. Professionally presented with a flexible yet methodical approach and a positive, proactive attitude to create a robust outcome with confidence. Adaptable to different industry requirements with a flexible schedule.
- Successfully completed Primavera P6 professional fundamentals Training at Oracle University.
Assistant Planner or Planning Engineer, Costain, Thameslink - London Bridge Station Redevelopment
2013 – 2015 Current works – Costain - London Bridge Station Revelopment (as part of the Thames link programme worth £6.5 Billion):
I currently work for Costain at London Bridge Station Redevelopment, since working here I have experienced planning for civil works undertaken by Costain (otherwise known as self-delivery works) and Early works such as demolition, piling and drainage (which have been part self-delivery and part subcontracted).
I do both short term and long term planning.
Pagination
- Previous page
- Page 9
- Next page