Mechanical Engineer, U.M.D, METKA BRAZI ; Coker Petromidia
Construction, installation and repairs refineries, petrochemical, oil and power installations
RO
Construction, installation and repairs refineries, petrochemical, oil and power installations
Constructions-assembly-spare parts reconditioning, refinery reparations, petrochemistry, oil and power equipments
Preparing work ahead for field (inside and outside refinery) ,creating-planning work in Primavera P6
Roads, bridges.
Site Engineer , Shapir Structures
"Design and Build of National Road 18 Moisei-Iacobeni"
Nov. 1999 – Aug.
Implementation of east variant ( amount of works 110 millions € ) site of Cluj-Napoca, Romania, Lot 1 & Lot 2. from Km 0+000 to Km 18+700, 2500000 m3 of earthmoving, 200000 lm of micropiles and tie-backs, 1500 lm of viaducts and two overpasses. Cost control, STR software, internship at warehouse, internship at administration department foreign branch Impresa Pizzarotti, Cluj-Napoca, Romania.
Identification of claims for delay and/ or disruption on the Bucharest to Constanta rail project
Utilisation of time slice analysis to identify causes of critical delay to a rail rehabilitation project
TILOS software
Contract administration of notices
FIDIC Red Book – contract values up to €150 million
Drafting of claim documents for two separate Contracts on the Bucharest to Constanta rail project
Claim 1 for an extension to the reasonable Time for completion date previously awarded by the DAB
Claim 2 for an extension of time to July 2013 using timeslice methodology to show delay impact to critical path
FIDIC Red Book – contract values up to €150 million