PM Group Planner
Current Role
IE
Current Role
Current Role
Current Role
Current Role
As a section planner of the construction project I was responsible for planning and coordination of the construction works on the Section 4 of M3 Motorway Clonee to North Kells. Using Ms Project to control the progresses of work, and building and controling of the time schedule.Preparing monthly reports, 3 weeks, months looking ahead programmes. Analyzing costs, materials, resources needed for realization of the project.
As a Project Planner I became responsible for planning and coordination of the construction works on the M3 Motorway for all sections (60 km).Building wide range of Construction Plans, Resource Usage Schedules, Tracking Progresses of The Work, Preparing wide range of Reports, Analyzes. My besic tool is the Ms Project.Duties connected also with Costs Analyzing,Materials Quantities,Resources Allocation. Preparing grafic view of planned works as well as any kind calculations.Possition strictly connected with a Project Management. (Risk Assesment Analyzes, Mile Stones Analyzes, PERT Analyzes)
June 2004-Dec 2004
Amey Rail. Level Crossing Conversions (RAIL Belfast). 2004-2004.
- Project Planning and Progress Monitoring.
- Principle Project and Installation Planner.
- Development and maintenance of a stand-alone P3 programme primarily used for progress monitoring, critical path and, cost analysis.
Current Role