PH
Philippines (AS.PH)
Operations Manager, GN Power, Fleet Wide
Operation Manager for OMT at GN Power.
OMT manages all phases of the Capital Projects and Outages for the GN Power fleet of CFP units. As the largest owner of energy in the Philippines, it is critical our units remain online producing energy.
I head up a team of over 40 professional Project Services and Technical resources that plan, prepare, procure, contract and execute these projects and outages.
ada christine copiaco
Amadeux Voig
joshua ceballos
Civil Engineer / Scheduler, Poyry Energy, Incoporated (Philippines), North Negros Bio Power Plant Project (NNBP)
Responsibilities:
- Managed and scheduled remaining works in North Negros Bio Power (NNBP) 25MWe Biomass Power Plant located in Manapla, Negros Occidental Philippines. Includes coordination with Poyry Construction Team and NNBP O&M.
- Designed additional structures as required by O&M (Operation & Maintenance) Team of NNBP Project including procurement coordination and construction supervision.
Civil Engineer/ Scheduler, Poyry Energy, Incorporated (Philippines), Power Plants
Responsibilities:
Jisar Castillo
Jisar Castillo is an experienced Civil Engineer who had work as a planner (scheduler) for the contractor, the consultant and as an expert. Managing coordination of activities in engineering, procurement and construction. Involved in various sector of construction such as high-rise buildings, commercial buildings, hotels, underground power cables, substations, infrastructures, power plants and airport.
Planning (Scheduler) Engineer, BF Corporation, Robinson's Place
Responsibilities:
- Prepared Baseline Schedule, Histogram and S-Curves.
- Prepared Progress Reports and Cost Reports.
- Evaluated sub-contractors’ and suppliers’ billings.
- Prepare correspondence and construction methodology.
Project Involved:
- Robinson’s Place (Philippines)
Jesus Aniano Jr
Pagination
- Previous page
- Page 3
- Next page