Malaysia (AS.MY)

MY

4D Planner and Client pre-construction planning, TECHNIP GEOPRODUCTION (M) SDN BHD, LIUHUA LH4-1 Subsea Development Project

START Date
  • Preparation of project schedules for tendering.
  • Running various scenarios for carrying out the works.
  • Preparation & maintenance of detailed project schedules for live projects.
  • Preparation of S-curves and updated schedules for incorporation in Client Monthly Reports.
  • Preparation of information for incorporation into internal reporting.
  • Advising PM/PCM of any deviation from schedule.
  • Working with PMT in coming up with recovery measures when deviating from schedule.
  • Running various scenarios during the works - eg

PLANNING ENGINEER, KNM STEEL CONSTRUCTION SDN BHD, 1 unit of Jet A1 Drumming for Petronas Penapisan Melaka S/B, 1 unit of Sulfinol Reboiler Tubes for Malaysia LNG S/B, 3 Column Units (Butanol Project) for Union Carbide/Petronas JV, 3 Heat Exchanger Units

START Date
END Date
  • Prepare schedules on Microsoft Projects for assigned projects including manpower loading, S-curves and project reporting on periodical basis as required by the project team/client
  • Make regular site visits to assess project progress and sub-contractors work done.
  • To liaise and coordinate with the Procurement, Production and Engineering departments on reports and provide advise on respective project status on all activities of the projects.
  • Responsible for under invoicing and cost control for assigned projects.
  • Coordinate and expedite all assigne

Senior Planner, Putrajaya Holdings Sdn Bhd, Basement for Impiana Hotel a, Common Utility Trench (C.U.T) for Precinct 2 East and West, Equestrian Park at Precinct 5, Precinct 3 and Part of Precinct 4 and Remainder of Precinct 4.Tunnel Management System (T.

START Date
END Date
  • Pre-Contract Implementation.Preparation for the appointment of consultants, contractors and any specialist consultants for the projects; includes the preparation of Tender Committee Papers and the preparation of the Letter of Awards (LOA).

Involved in the tender evaluation process and report preparation for the Technical and Commercial Evaluation Report to be presented to the Tender Committee for award of contract, as well as in the preparation of Tender Committee Papers for the presentation to the Committee.

  • Schedule Preparation.

Senior Executive - Risk Management, Putrajaya Holdings Sdn Bhd, Construction of Pullman Hotel, Terrace Houses and Apartment

START Date
END Date
  • Contract Administration.  Leadreview team for contractor’s EOT claims and to maintain company’s exposure due to time extensions and related loss & expense costs is minimal. Validate and update sufficiency of planning and scheduling allocation by contractor in Bill of Quantities (BQ) and Contract Document for all assigned projects.
  • Quality Contract Administration.

Senior Planner, Petrofac Engineering Construction, Engineering Services for West Desaru Mobile Oil Production Unit (MOPU) for Petrofac E&C Sdn. Bhd.

START Date
  • Lead the development of an integrated project planning system, comprising designing the process architecture, rationalising and integrating engineering applications (databases, manhour tracking system and document control system) for seamless and holistic reporting.
  • Develop, validate and prepare project planning package inclusive of progress measurement methodology, project schedule using critical path method (CPM), work breakdown structures (WBS) and S-Curve, manhour loading and histogram and other technical data as required according to client requirements.
  • Moni

Civil/ Planning Engineer, UEM Builders Berhad, Construction of High-Rise Building

START Date
END Date
Experience Hours (Planning & Scheduling)
2200
Experience Hours (Cost Management)
300

Career started in 2006 as Planning Engineer with UEM Builders Berhad. I was responsible for monitoring and updating the construction progress of high-rise building for UEM Group Head Quarters at KL Sentral. My key role is to assist the Project Manager, Senior Planner and Project team, supervisors and Subcontractor for collating all the physical progress.

Senior Planner, Sarawak Shell Berhad, MULTIPLE OFFSHORE PROJECTS

START Date
END Date

 

  1. 1985 - 1987 SARAWAK SHELL, MALAYSIA

SENIOR PLANNING ENGINEER

                                                                OFFSHORE OIL AND GAS PROJECTS

 

Artemis

Kikie Maulana

First Name
Kikie
Last Name
Maulana
Oldest experience
Years Experience
42

Planning & Scheduling including S-curves development and update, Convergence Plan Assessment, Reporting

Muhamad Fikri Abdul Jalal

First Name
Muhamad Fikri
Last Name
Abdul Jalal
Professional Since
Years Experience
0
Telephone Number
+60164113703
Facebook Profile
https://www.facebook.com/fikri.jalal

I am working with a construction and development company somewhere in Kuala Lumpur as a Planning Engineer. It's been three years I'm working in this such roles; preparing work programme for projects, update the progress, report the progress, visualise the comparison of the latest actual expenditure to the budgetary cost through the s-curve and etc. Frequently use Microsoft Project as my planning software, however I still can manage to use Primavera P6 to plan a project at intermediate level.