Sr Planning Engineer, BRUNEL INT’L SOUTHEAST ASIA PTE LTD seconded to GLOBAL PROCESSING SYSTEM, ADPF ADANGA PRODUCTION FACILITY – FEED

START Date
END Date

• Responsible for the preparation of revised Master Deliverable Register (MDR) plan, revised overall / disciplines S-curves and the

Manpower Histogram.

S Nazri

S
S Nazri 👤 Member for 14 years 3 months
First Name
S
Last Name
Nazri
Professional Since
Years Experience
0
Telephone Number
0135232364
Facebook Profile

- Over 12 Years various international experience in Shipbuilding & Shiprepair.

- Excellent analytical skills and proficient in Microsoft Project, Mars Planning, Earned Value Methodology, Excel, Word, PowerPoint

- Prepares construction Build strategy, schedule, man power load and project reports using earned value analysis.

- Schedule analysis, Utilize work breakdown structure (WBS), project breakdown structure (PBS) and evaluation of schedule float and utilization of critical path method (CPM).

- Provide analysis of&nbsp

APAC PMO Lead, Hewlett Packard (HP) Enterprise Services, Royal Dutch Shell - IT Outsourcing Program

START Date
END Date

Lead a team of to start up a APAC PMO department. Tasked to provide resource, planning, scheduling and control support to all IT Infrastucture projects in the Shell Account.

mohd ridzuan md taib

First Name
mohd ridzuan
Last Name
md taib
Years Experience
0
Telephone Number
+60127127345

 

1. Total Project Management via CPM

2. Microsoft Project 2010 - Basic to Advance Level (1-3)

3. Construction Project Management

4. Primavera P6 – Basic to Advance Level (1-3)

NOOR AZAM ZAKARIA

First Name
NOOR AZAM
Last Name
ZAKARIA
Oldest experience
Years Experience
42
Telephone Number
+60197511425
  • Prepare project planning package (Project Baseline Schedule, Project Earned Value S-Curve, Progress Measurement Basis and Project Measurement Matrix).
  • Develop overall planning of work activities, manpower histogram and perform scheduling of activities into logical network from jobcards developed by workpack team.
  • Establish, communicate, track and report site installation progress using the principles of Earned Value and Critical Path Management.
  • Participate in project meetings and revise the schedule as deem necessary and advises the team about the time