NG
Nigeria (AF.NG)
Planning/Scheduling Engineer, BOG, Domestic Supply Obligation project
Position: Planning/Scheduling Engineer
Responsibilities:
Blaise Obidegwu
I am an experienced Planner/Scheduler with experience in the Oil and Gas Industry and proficient in Primavera P6 and Microsoft Project, Excel and other Microsoft Office applications. I am a certified Project Management Institute Schedule Professional (PMI-SP).
Planning Officer, Prodeco International Limited., (various projects)
- Preparation of detailed Construction Schedule.
- Cost-load schedule for forecasting revenue and prepare project S-curve.
- Prepare progress based on schedule and WBS weightage.
- Analyzing and tracking of man-hour and equipment-hour for projects
Planning/Reporting Officer, Total E&P Nigeria, OML58-Upgrade Obagi
- Monitoring of the Project schedule and reporting of any constraint or deviation to the overall Project Plan.
- Collate daily man-hours for activities on a detailed basis and roll up to weekly summary report.
- Follow up on Project quantities by checking, comparing & reporting actual quantities against planned quantities weekly.
- Measurement and reporting of work progress on a weekly basis.
- Verification of progress on activities submitted by EPC contractors.
- Preparation of daily, weekly and monthly progress report.
oni adedamola
Planning Engineer, sudelettra Nigeria Limited, Oil center revamping
5years as a planning/project control engineer in multi-national oil and gas firm. 3 successful multimillion dollars projects executed. Roles includes: Planning/Scheduling, Tracking progress, Risk assessment and Reporting.
EPC Planner, SEPTA ENERGY LIMITED NIGERIA, Oron Pipeline Project
Project Reporting
· Produce weekly and monthly Project Progress reports for all the facilities project in a timely manner
· Prepare any other required report requested from time to time.
· Ensure accurate and timely reporting and respond to the requirements of both Site and Home Office management needs
Albert Ezekiel-Hart
· Ensuring that established planning and scheduling methodology is followed in order to develop a workable schedule.
· Developed project schedule which shows hierarchical work breakdown structure using Primavera (P6).
· Maintain project work breakdown structure (WBS).
· Reviewing and updating project schedule.
Planner, Alcon Nigria Limited, AKWA-IBOM INTERNATIONAL AIRPORT OYO, GREATER PORT HARCOURT CITY DEVP. BULK SEWER AND PUMP STATIONS
• Ensuring that established planning and scheduling methodology is followed in order to develop a workable schedule.
• Developed project schedule which shows hierarchical work breakdown structure using Primavera (P6).
• Maintain project work breakdown structure (WBS).
• Reviewing and updating project schedule.
• Analyzed and added resources and roles to activities on the project schedule
Pagination
- Previous page
- Page 39
- Next page