Senior Engineer, GTP, Various
Formulating detailed cost estimate for piping and equipment disciplines.
Sharer in work estimate.
P3 Schedule preparation, based on engineering, materials delivery and procurement schedule Preparation documents: Schedule development, Schedule resource loading & Leveling andwork progress control :
- Gas storage tank (sphere : 2000 m3)
- Replace an existing pipeline (9,2 km of 10”,12”, 16” and 20”)
- Enhanced oil recovery in R / Baguel,