Senior EPC Planning Engineer, Woodgroup PSN, Thistle Platform Power Upgrade
START Date
I have worked in Project Controls since the late 1990’s. During this period I have held positions at all levels.
I have worked in Project Controls since the late 1990’s. During this period I have held positions at all levels.
I have worked in Project Controls since the late 1990’s. During this period I have held positions at all levels.