Shipbuilding

Planning Engineer, ARAM Group, Shipbuilding

I
Iman Karimi 👤 Member for 10 years 5 months
START Date

- The ARAM Group is Knowledge Provider specialized in project control, project management and project management software. - As a Planning Engineer I have the chance to work for various clients in different fields and be involved in interesting and challenging projects while expanding my knowledge through participating in professional courses and workshops.

Planner, Scheduler, Heijmans, Asml, Visser Smith, Damen, Imtech Marine, Dupont, Crusell, BAM, Jacobs, Infra, Oil & Gas, Petrochemie, Pharma, Shipbuilding, High Tech

R
Ramin Amir 👤 Member for 10 years 11 months
START Date
END Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
40000
Experience Hours (Forensic Analysis)
40000

WORK EXPERIENCE

 

 

 

Okt 14 – May 15

Crucell (Johnson & Johnson(J&J))

Planner, Scheduler, Heijmans, Asml, Visser Smith, Damen, Imtech Marine, Dupont, Crusell, BAM, Jacobs, Infra, Oil & Gas, Petrochemie, Pharma, Shipbuilding, High Tech

R
Ramin Amir 👤 Member for 10 years 11 months
START Date
END Date
Experience Hours (Planning & Scheduling)
40000
Experience Hours (Cost Management)
40000
Experience Hours (Forensic Analysis)
40000

WORK EXPERIENCE

 

 

 

Okt 14 – May 15

Crucell (Johnson & Johnson(J&J))

P6 System Administrator, BAE Surface Ships, Shipbuilding

START Date
END Date

Duties include the setup, structure, administration and security of both Primavera P6 and Artemis Project View.
Also assisted in the implementation of Project Genesis (replacement of all legacy systems) across BAE (Barrow & Southern Sites). Day to day duties also require me to set, monitor and cover an in-house developed ‘Job Scheduler’. This enables batched jobs to be run out of hours to minimise downtime on the Planning Systems databases.

P6 system Administrator, BAE Surface Ships, Shipbuilding

START Date
END Date

Duties include the setup, structure, administration and security of both Primavera P6 and Artemis Project View.
Also assisted in the implementation of Project Genesis (replacement of all legacy systems) across BAE (Barrow & Southern Sites). Day to day duties also require me to set, monitor and cover an in-house developed ‘Job Scheduler’. This enables batched jobs to be run out of hours to minimise downtime on the Planning Systems databases.

Engineering Tradesperson, Austal Ships, Shipbuilding

E
Eyad Nahem 👤 Member for 15 years 2 months
START Date
END Date

Engineering Tradesperson

Jan 1998 - Jun 2001                          Austal Ships Pty Ltd                                        Perth, Australia

And from Oct 2002 – Jul 2007

The main responsibilities were:

design production support officer/draftsperson, Austal Ships, Shipbuilding

E
Eyad Nahem 👤 Member for 15 years 2 months
START Date
END Date

Design Production Support Officer - CAD Draftsperson

Jul 2007 - Jan 2008                           Austal Ships                                                &n