GREAT MAN MADE RIVER PROJECT

Planning Engineer, Siemans, GREAT MAN MADE RIVER PROJECT

A
Alan Leslie 👤 Member for 24 years 1 month
START Date
END Date
Experience Hours (Planning & Scheduling)
2750

Development of schedules for design and installation of the SCADA remote operating systems for Great Man Made River Phase 2 (the pumping of fresh water from an underground lake through 1,000km of 5m diameter Water Pipe and Pumping Stations between south Libya and Tripoli).

Specialist Planning, Dong Ah Consortium, GREAT MAN MADE RIVER PROJECT

START Date
END Date
Experience Hours (Planning & Scheduling)
3000
Experience Hours (Cost Management)
300
Experience Hours (Forensic Analysis)
500

Specialist Planning:

Great Man Made River Project Libya.

Production of Management reports and liase with the Libyan Government as required by letter and meetings.

project planning assistant, Brown & Root North Africa Limited, GREAT MAN MADE RIVER PROJECT

START Date
END Date

·         Responsible for reviewing sub-contractors programs using Open Plan & Primavera P3

·         Produced the contract Monthly Progress Reports (using Excel)

·         Held meetings withmain contractor's project planners: Dung Ah Consortium and SIEMENS