2008 – 2011General Electric - Wide Control Belfort, FR
Project Planner
Responsible for 16 EPC Energy Power Plants projects, planning and scheduling activities in compliance with Company rules/proceduresand client's guidelines.
· Commissioning Project Chicontepec II, Poza Rica, Veracruz, Mexico. Four different locations (Tajin V, Agua Fria III, Coyula I and Humapa). Natural gas compression plant. Expertise with screw compressors, PLC and control. Fault Detection and reengineering compressors plants. Installation and commissioning
Project: Engineering, Procurement, Construction and Commissioning (EPCC) of Zarzaitine Oilfield Expansion Project (Surface Facility) in Zarzaitine, In-Amenas Algeria. CLINET: SONATRACH
A total of 18 years experienced in Construction Industry (including 10 years in Engineering/Procurement/Construction), a combination of 06 years in Oil & Gas Operations .
Develop, monitor, track, analyze, forecast, and report on multiple project budgets, commitments, expenditures, project progress, productivity, manpower, work plans schedules, and subcontracts.
- Develop construction baseline and required resources for relevant parts of the project estimates to be implemented as a base line reference for subsequent project monitoring and controlling.
- Develop procurement baseline identifying the products to be procured, the timeframe and method of  
More than 10 years of professional experience working in International Consultants and Major Contractors as a Senior Planner Engineer in different project stages (Engineering, Procurement, Construction and Commissioning) principally in the Oil & Gas sector.
Responsibilities include an engineering background with a significant construction experience in Planning Control establishing Detailed Master Project EPC Schedules for Civil, Structural, Mechanical Equipment, Piping, Pipeline, Elec
o Using state of the art tools & techniques, his skills in Planning & Scheduling include: Planning the scope and deliverables in a project schedule. Develop project-coding structures to establish a standard reporting procedure. Forecast the impacts on the Schedule while monitoring the project. Identify issues, changes and recommend corrective actions. Analyze potential bottlenecks and su