Forensic Delay Analyst, BALFOUR BEATTY, East London Line
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
Senior delay analyst reviewing the monthly programmes and producing a windows analysis for part of the project. Primavera based. Report writing.
Inspection for assessment of Kingsland Road Bridge, a steel truss bridge in Shoreditch. The bridge soffit was inspected during night-time road closures from a mobile elevated working platform.
2007 – 2009 Planning Engineer
Role as a planning engineer for Mott MacDonald (using P6 software) supporting bids/projects on the East London Line development and Crossrail.
Currently working as a Major Projects Planner for Downer EDI in New Zealand. Main focus at the moment is to develop planning into its own entity as part of the projects life cycle.
East London Line Extension. Value £360 million for Transport for London. Upgrade and extension of the existing East London Line Railway. Responsible for the construction planning for 2 of the 3 sections. Work included civil structures, depot construction, permanent way, signalling, telecoms & power.