Mechanical Project Engineer, ETA Engineering Pvt Ltd, Delhi Metro Project
START Date
END Date
- Estimation and costing for MEP activity and preparation of proposal by clearly studying the tender document like specification, Drawing and tender conditions.
- Preparation of Job Cost analysis and controlling the cost during the procurement of material.
- Identifying the extra item and submitting the variation proposal for the approval.
- Preparation of monthly bill and measurement sheet as backup document.
- Preparation of MEP baseline program and procurement of material as per the project schedule.
- Calculation of Pump Head,