Site Engineer

Site Engineer, Mavani Group of Construction, Marathon Innova, Multistorey Building with 5 Floor Car Parking

K
Kiran Yadav 👤 Member for 12 years 1 month
START Date
END Date

ü  Execution of Piling as per soil condition & checking the same upto required depth

ü  Execution of project in given time schedule along with safety & companies standards

Site Engineer, Jyothi Engineering, A P Rayon-Expansion of Pulp production from 300 TPD to 350TPD

START Date
END Date

·         Actively participated in Mechanical installations and fabrication of steel & carbon steel piping for Pump Mill & Clo2 Plant.

·         Handled the erection of process equipments like drum washer, gas free rotator vacuum, tank ages, and chimney of Soda Recovery Boiler etc.

Site Engineer, AFRINA Trading and Construction , Jumana Tower-Pearl Qatar-Doha-Qatar

START Date
END Date

• Responsible for supervision finishing works ( Block Works-Plastering-Water Proofing-Ceramic-Painting-Gypsum Board)

• Quantity Surveying of mentioned works for sub-contractors

• Controlling progress of mentioned work activities through daily basis reporting.

• Planning of work activities on a weekly basis plan.

Site Engineer, Ahmet Aydeniz Co., Aposto-Wondo-Negele Road Upgrading Project Contract-2 IRBA MODA - WADERA ROAD

START Date
END Date

-          Planning the work schedule of responsible site

-          Preparing the Request For Inspection documents

-          Preparing daily reports

-          Controlling the quality of the works on site

Site Engineer, S.M.Construction,Goa,India, NH – 4 (Pune to Bangalore National Highway) four-way lines Project Package: IV-C (Chain age: 275+000 to 290+000).Davangere to Harihara.

START Date
END Date

Project:NH – 4 (Pune to Bangalore National Highway) four-way lines Project Package: IV-C (Chain age: 275+000 to

290+000).Davangere to Harihara.

Four way lines work such as Clearing & Grubbing, Embankment, Sub Grade, GSB, WMM, BM and utility ducts, Culverts etc.

Site Engineer, S.M.Constructions,Goa,India, Hemavathy Mini Hydel Project. Gorur, Hassan (dist) Karnataka.

START Date
END Date

Mini Hydel Project. Gorur, Hassan (dist) Karnataka.

Canal excavation 1.3 Km, Weir, Canal Regulator, Road works, Hume pipe culvert, penstock and Power house and Other Building constructions.

Site Engineer, Alfred McAlpine, Various

START Date
END Date

Site engineering and site management in relation to various major building projects throughout the UK.  Projects include:

·  Preston Law Courts £25 m

·  Halifax Data Centre £9 m

Responsibilities include:

·  Health and Safety duties (inductions/inspections/method statements/risk assessment/COSHH)

·  Setting out

·  Material take off/orders