Senior Planning Engineer

Senior Planning Engineer, McConnell Dowell South East Asia, Fuel Oil Terminals

START Date
END Date

 

·         Preparation of a detailed schedule and planning work package for the monitoring of Bulk Liquids and Storage Plant in various stages of Engineering, Procurement, Fabrication, Construction and Commissioning works.

·         Disciplines includes Civilworks, Structural Steel, Mechanical Installation Works, Piping, Electrical and Instrumentation.

Senior Planning Engineer, ORASCOM CONSTRUCTION INDUSTRIES (OCI), Mall of Arabia Project

START Date

Senior Planning Engineer

(Orascom Construction Industries & Hassan Allam Sons);J.V (Nov 2007– Until now)

working as Senior planning engineer for J.V projects at Mall of Africa Project.

 Projects Budgets:

 1- Retail Mall & Geant Hypermarket & Kika Store: 1,327,000,000 L.E.

  Work include the following items:

Senior Planning Engineer, QDVC QSC, Lusail Car Parks Project

START Date
END Date

• Preparing detailed construction programme and identification of constraints, key
milestones and critical path.
• Preparation of engineering deliverable schedules and Procurement Planning.
• Defining Key Performance Indicators.
• Monitoring the progress and updating the schedule with the actual progress.
• Analysing various package subcontractor’s programme with reference to main contactor’s
programme.
• Preparation of comprehensive monthly and weekly reports for client and corporate
management.
• Training and leading junior plan

Senior Planning Engineer, ARCHIRODON CONSTRUCTION OVERSEAS CO. (S.A.), Branch3 Pumping Stations (PS1, PS2 & PS3) at South Valley Development, SHEIKH ZAYED Canal – TOSHKA - EGYPT

START Date
END Date

Branch3 Pumping Stations (PS1, PS2 & PS3) at South Valley   Development, SHEIKH ZAYED Canal – TOSHKA - EGYPT

The Civil works of each plant are construction of: Inlet Basin, Wet Pit Structure, Pump House, Control Building, Store Room, Discharge Basin, Fence with Guard House, landscaping, and Discharge Pipelines.

 

The electro-mechanical part consists of: (17 # Centrifugal pumps with its Accessories, Motors, Gear Boxes, Motor Starters, Non-Return Valves, Control Instruments, MV & LV Panels, Overhead Cranes, Stop Logs and its Monorails (2 No), Wee

Senior Planning Engineer, ORASCOM CONSTRUCTION INDUSTRIES (OCI), 2000 MTPD KAAP Ammonia Plant, Suez Industrial Zone, Egypt

START Date
END Date

2000 MTPD KAAP Ammonia Plant, Suez Industrial Zone, Egypt

The Scope of this subcontracted work shall consist of providing all items necessary to provide satisfactory completion of construction services (Temporary Construction Facilities and Services, Civil Works, Structural Steel Erection, Pipe Fabrication Execution Plan, Underground Piping, Aboveground piping, Architectural works, Mechanical Works, Electrical works Instrumentation works, painting works and insulation works) pertaining to the EBIC 2000 MTPD KAAP Ammonia Plant Project, located in the Suez Industrial Development Area,

Senior Planning Engineer, AMEC Capital Projects, Channel Tunnel Rail Link, United Kingdom.

START Date
END Date

Period Summary:         I was fortunate to be employed at the commencement of the Trackwork, Overhead Catenary and M&E Systems Project and utilized my experience to develop and integrate project controls procedures including Change Management.

Senior Planning Engineer, Railtrack, Manchester Victoria Area Infrasstructure Renewals

START Date
END Date

Senior Planning Engineer

Responsible for the preparation of Level 1 Summary and Level 2 Critical Path Networks and Bar charts for Feasibility Studies, Design Development and Construction.

The setting up of a cost control database for the North West Rail Zone, including Budget figures, Cash flow projections and cost monitoring.

The production and analysis of cost and schedule risk assessment models.

Senior Planning Engineer, BECHTEL, North West Water AMP2

START Date
END Date

Senior planner for the Water Treatment Works department. Responsible for all Water Treatment projects from Needs, Optioneering through Design and Construction to Commissioning. The preparation of Level 1 Summary and Level 2 Critical Path Networks and Bar charts for Design Development and Construction. Analysis of contractor’s Level 3 and Level 4 design and construction programmes. The preparation of a level 4 progress measurement system to measure design, procurement and construction.

Senior Planning Engineer, AMEC, Nuclear Bids

START Date
END Date

Responsible for the preparation of Level 1 Summary & Level 2 Critical Path Networks and Bar charts for Engineering, Design, Procurement and Construction. Manpower loading and the production of histograms and 'S' curves on New Project Tenders for Nuclear Work. The production and monitoring of tender submission programmes to ensure timely production of tender deliverables.