Senior Planner

Senior Planner, CNRL, DRU-VDU + H2S

START Date
END Date
Experience Hours (Planning & Scheduling)
1250

Working with CNRL on Madrid, EPC controller with Primavera 6.2/.7 (P6). Horizon Oil sand refinery. Design of level 3 from level 4, control of both levels. Principal engineering contractor controller, first construction contractor controller.

Senior Planner, Network Rail Ltd, Reading & Crossrail, WCML

START Date
END Date

Season railways and construction professional with extensive commercial, project management and project controls experience specialising in prject planning on major railway infrastructure contracts.

Strong commercial background with significant experience and involvement in claims preparation and dispute resolution.

 

All railway disciplines including Signalling, P Way, Civil Engineering

Senior Planner, SNAMPROGETTI – Milano, Combined Cycle Power Plant, Fertilizer complex, Refinery upgrade

START Date
END Date

Main Projects:

  • ENGRO New Ammonia – Urea Plant:

TKLS Project for the construction of a fertilizer complex consisting in two plants: the first one for the production of 2,194 MTPD of Ammonia using the technology licensed by Harold Topsoe A/S and the second one for the production of 3,835 MTPD of prilled Urea using Snamprogetti S.p.A technology.

Senior Planner, Tecnimont, New Propane Dehydrogenation (PDH) Plant

START Date

Scope of work:

To build a Propane Dehydrogenation (PDH) Unit with design production capacity of 510.000 MTPY of propylene based on the UOP “Oleflex” Propane Dehydrogenation technology. The scope of works consists in Detail Design, Engineering, Construction and Pre-commissioning services activities.