Scheduling Engineer

Scheduling Engineer, AECOM Arabia Ltd. Co., Saudi Aramco / PetroRabigh / YASREF / GEMTEC / NWC

START Date

: Review and study each contract to align project schedule requirements.

: Analyzed and integrated contractor schedules into the Manifa Master Schedule.

: Participated in weekly and monthly project reviews between Saudi Aramco and contractors.

: Conduct reviews of contractor’s schedules, progress reports and monthly invoices.

: Created summary level presentation of the baseline and current schedules.

: Review, update, and prepare Project Completion Schedules (PCS) based on the late curves.

Scheduling Engineer, HICAPS, Calvary Methodist Church

START Date
END Date

Working with the Contractor and subcontractors facilitated the development of the baseline construction schedule using planning information. Provided bi-weekly updates and summary narrative reports detailing the longest/critical driving paths, performance analyses, suggestions to improve and/or avoid potential impacts for immediate timeframe and projected timeframe.  

Scheduling Engineer, HICAPS, BCA-SC Dreamliner - Welcome Center Building

START Date
END Date

Facilitated the development of and maintained a cost and resource loaded design/engineering schedule for a new construction building project. Received and entered status information; provided earned value reporting to the Client and Owner bi-weekly.

Scheduling Engineer, HICAPS, BCA-SC Dreamliner - Delivery Center Building

START Date
END Date

Facilitated the development of and maintained a cost and resource loaded design/engineering schedule for a new construction building project. Provided earned value reporting to Client and Owner.

Scheduling Engineer, Technip France, Polypropolene Plant 2 (PP2)

START Date
END Date

I was part of a core team of individuals that was site based. The project was multi disciplinary, design, procurement, fabrication and erection of piping, civil works, structural steel fabrication and erection, electrical and instrumentation erection, in the petrochemical industry. Using Primavera software, I helped to compile & update level 4 integrated schedules, providing weekly, as well as monthly reports for Management meetings. All subcontractors’ schedules were incorporated as sub-projects into our over-all schedule, creating a level 4 integrated schedule.