PLANNING ENGINEER

Planning Engineer, Wood Group, Offshore Facilities Maintenance and Upgrading, EPCIP of CPSE Water Injection Extension Phase 2 Project, EPCI of Removal of Redundant Facilities

START Date

Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation

Planning Engineer, Mustang Engineering, Alternative Bridge Landing Module (ABLM) on the North Rankin A (NRA) platform

START Date
END Date

Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor

Planning Engineer, GAS Arabian Services Co Ltd., Sales Gas PipeLine Project to PP-II, Wasit Utilities System,Core Hydrocarbon Facilities(Pipeline project)

M
Mohd Anjum 👤 Member for 15 years 4 months
START Date
END Date

Curremtly Working as a Planning Engineer in one of the EPC company

and doing one of the project of "Sales Gas Pipeline Project for PP-11"

As a Planner i got total 2 years of experience in Oil and Gas Sector with hands on experience in project planning and scheduling Utilities ,Pipeline and other construction Project using tools like Primavera P3 and P6 and 7(P6.7).

familiar with MS Project with fluency in MS Excel and MS Access DB.