Lead/Senior Planning Engineer

Lead/Senior Planning Engineer, May Gurney, Various Rail & Civil Infrastructure Projects

H
Herman Louw 👤 Member for 19 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
2000
  • Control, Co-Ordinate and Update the Planning of the Portfolios in the Structures Partnership / Framework.
  • Ensuring a coherent detailed Programme is available for every Project/Scheme.
  • Monitoring the achievements to the Programme and driving the future key dates.
  • Recording of information for actual achievements.
  • Produce all necessary Management Reports for consideration and review.
  • The upkeep of milestone production figures and progress curves.
  • Control and Monitoring of the Milestone Change requests to the client.
  • The recording and

Lead/Senior Planning Engineer, alfanar Co., Construction of Residential and Industrial Complex for Aramco at Khurais,Construction of 380 Kv sub-stations,380 KV U/G Cables

START Date
Experience Hours (Planning & Scheduling)
6450
Experience Hours (Cost Management)
6450

Alfanar Construction Companyis a reputed EPC contractor experienced in executing turnkey projects for more than three decades in the entire Gulf region. Alfanar is an ISO 9001:2000 certified company. The main business activities include large-scale power generation, transmission, and distribution (Sub-station380kv & 110kv) and Wind and solar power plant (100MW) and other related projects.

 

Lead/Senior Planning Engineer, ALTOUKHI CONTRACTING COMPANY, Hail Combined Cycle PP

START Date

·         Prepare and update project schedule based on the contract.

·         Set work program and target milestones for each phase based on the project plan.

·         Monitor critical activities based on the project schedule and advise project management.

Lead/Senior Planning Engineer, Laing O'Rourke, C502 Liverpool Street Station - Crossrail

D
David Brown 👤 Member for 18 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
6000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
1000

This role has brought me back to Laing O'Rourke

Very similir role to the last role I had at Bam Nuttall.

My Responsibility level was slight more senior and included Line Management for the first time.

The Project included the following:

1. Construction of Broadgate BTH Box at Liverpool Street Station, Crossrail

2. Piling & Heavy Propping.

3. Concrete Skin Walls, Frace & Structure

4. Ticket Hall Fit-out & MEP (inc 3 Banks of Escalator)

My Role included.

1. Overall Programme & Project Controls

Lead/Senior Planning Engineer, Bam Nuttall Limited, Crossrail Farringdon - C435

D
David Brown 👤 Member for 18 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
1000

This project ran straight on from the previous Farringdon Scheme moving from Laing O'Rourke to Bam Nutall for project continuity.

My role was as a Senior Planner reporting to a Lead Planner. I was responsible for the Planning, Timing & Sequencing of the construction of the new Eastern Ticket Hall (ETH). This was a heavy Civils project and included the following:

1. Seacant Piling

2. Concrete Skin Walls Frame & Structure

3. Heavy Propping through Main Box Construction

4. SCL Heading & Tunnels

5. Lindsey Street Bridge Re-furbishment

Lead/Senior Planning Engineer, Arcadis Logos S/A, Puma Project

START Date
END Date
Experience Hours (Planning & Scheduling)
2000

- Senior planning engineer at R$8,5bi greenfield pulp plant - Klabin Puma Project – Ortigueira – Paraná - Brazil. Responsible for monitoring, controlling and reporting of BOP (Balance of Plant) Program from 08/2014 to 02/2015. Responsible for monitoring, controlling and reporting of Water Plants and Chemical Plants from 02/2015 to 08/2015. - Responsibilities: Expert Judgment on planning/scheduling questions. Integration and analysis of planning information.

Lead/Senior Planning Engineer, Time-Now Engenharia S/A, Horizonte 2 Project

START Date
Experience Hours (Planning & Scheduling)
4000
Experience Hours (Cost Management)
0
Experience Hours (Forensic Analysis)
50

-Senior planning engineer at Horizonte 2 Project, brownfield plant adjacent to existent pulp plant (Horizonte 1) at Três Lagoas – MS - Brazil. Monitoring, controlling and reporting of Fiberline (Andritz), Chemical Plant (AkzoNobel), Oxygen Plant (Praxair). Consolidation and revision of Program Report from 09/2015 to 04/2016.-Responsibilities: Expert Judgment on planning/scheduling questions. Integration and analysis of planning information. Analysis of the quality and reliability of information.

Lead/Senior Planning Engineer, Petrofac Engineering Construction, Laggan Tormore Shetland Gas Plant

START Date
END Date
Experience Hours (Planning & Scheduling)
3150
Experience Hours (Cost Management)
500
Experience Hours (Forensic Analysis)
300

Member of the Project Controls Team responsible for the development of Petrofac level 3 & 4 programmes.Cordination of Sub-Contractors level 5 programmes reflecting Petrofac level 3 milestones.

Lead/Senior Planning Engineer, CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).