EPC basis Erection of Cracker Furnace Package and Composite Works for Gas Cracker Unit for Petrochemical Complex – II, Gas Authority of India Limited, Uttar Pradesh, India.
Planning, Scheduling, Monitoring & Reporting: Studying contract documents and scope, generation of the proposed WBS and activity list based onthe required (or suitable) level of details. Studying the logical and strategic sequence of work Breakdown of cost-related data to generate the cash flow charts based on BOQ and schedule ofworks. Preparing related narrative reports for the submitted schedules. Collecting the actual site data for updating and monitoring Establish simple document manageme
• Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022 – Al Khor, Qatar – MEP, Electrical – MV, LV, ELV systems & ICT system – Review of LOD300, preparation of LOD400 & LOD500, Procurement, Installation, Testing, Commissioning & Handover
• Al Bayt Stadium Project – 60,000 capacity : FIFA Stadium Project for World Cup 2022 – Al Khor, Qatar – MEP, Electrical – MV, LV, ELV systems & ICT system – Review of LOD300, preparation of LOD400 & LOD500, Procurement, Installation, Testing, Commissioning & Handover
As Contractor’s Planner, I provide Baseline management, resource loading and analysis, progress update and cash flow integration based on earned value methods.
Review overall project status with the Project Management team and recommend corrective action where necessary.
Provide support on tender preparation and submission at Head Office.
Liaison with the claims team to ensure all contractual matters are maintained and protected.
As planner of the PM Team for the project I establish and define any job oriented project control procedures and identify the