Construction Project Planner / Senior Planner

Construction Project Planner / Senior Planner, Murphy International Limited, Solefields Reservoir No.1 Replacement, Weir Chamber Construction, Blindley Heath to Outwood Pipeline

START Date
Experience Hours (Planning & Scheduling)
7200
Experience Hours (Cost Management)
3000
Experience Hours (Forensic Analysis)
1000

Support the Work Winning team and project teams with producing and reporting cost loaded work programmes/schedules in Primavera P6 format, for the purpose of co-ordinating works with Sub-contractors and other third parties working on the Civil, Power, Utilities, Railway and Building sectors. Responsible for creating both tender and project programmes to support the company in securing future revenue, and leading project teams to ensure projects are completed safely, on time and within budget.

Construction Project Planner / Senior Planner, Engineering Consultant Group, MAHMOUDIA 330 MW SIMPLE CYCLE POWER PLANT

A
Ali Ayad 👤 Member for 7 years 10 months
START Date
END Date
Experience Hours (Planning & Scheduling)
4400
Experience Hours (Cost Management)
2900
Experience Hours (Forensic Analysis)
100

Responsibilities:On Site: Planning, scheduling, monitoring, and analyzing project progress; Estimating/allocating required resources; preparing supply plans; Following up on work executed on site; determining and proposing corrective actions fordeviations from project schedules and resources; Performing quantity surveying and following up on invoices; Preparing cost estimates and annual budget studies; Utilizing Primavera Project Planner and Microsoft Excel to generate reports; Closel

Construction Project Planner / Senior Planner, Al Kharafi National-Egypt, Uptown Cairo Zahraa Al Mokattam (GIS 220/22 KV) S/S

A
Ali Ayad 👤 Member for 7 years 10 months
START Date
Experience Hours (Planning & Scheduling)
9050
Experience Hours (Cost Management)
950
Experience Hours (Forensic Analysis)
100

 Responsible for supervising the set-up, development, maintenance and monitoring of thedetailed project execution schedules; Responsible for the establishment of the Project Schedule Baseline and subsequentrevisions by maintaining an audit trail of schedule development and incorporation ofschedule trends; Interrogating inter-discipline schedule requirements / restraints to ensure logical worksequences across all disciplines of the project and co-ordinate the plan formulation acrossthe entire project;

Construction Project Planner / Senior Planner, DURAT AL SAHIL, & Oil & Gas Projects 2) Buildings 3) Infrastructure

START Date
Experience Hours (Planning & Scheduling)
10000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
6050

Roles & Responsibilities

 

·         Developing and Maintaining Detailed Project Schedules

·         Monitoring cost and commitment through requisition and invoice review

·         Ensuring active engagement of team members by the delegation of tasks to the appropriate person both on a long-term and on a day-to-day basis

Construction Project Planner / Senior Planner, Al Faisal Holding, Al Faisal Tower

START Date
END Date
Experience Hours (Planning & Scheduling)
2200
Experience Hours (Cost Management)
450
Experience Hours (Forensic Analysis)
700

Updating /Scheduling construction program using primavera project planner Reviewing & Approving Contractors Work Program Submissions.

Construction Project Planner / Senior Planner, CCC (Consolidated Contractors Company), QATAR RAIL PROJECT

START Date
Experience Hours (Planning & Scheduling)
3950
Experience Hours (Cost Management)
850
Experience Hours (Forensic Analysis)
3950
  • Formulate Master Plan Schedule, at all stages of the project lifecycle, from design and through to completion using primavera project planner through resources loading, including engineering, procurement and construction, in coordination with project team.
  • To coordinate with engineering and procurement department project teams to achieve optimum development and sustainment of project schedules.
  • Monitoring critical activities based on the project schedule and report to management
  • Interfacing, coordinating with subcontractors when needed, reviewing subcontractors

Construction Project Planner / Senior Planner, Volker Laser, Ross Planning contract for VolkerLaser (directly as worked with them previously, see below) – M1 River Trent Viaduct Column Strengthening, programme reorganisation in MS Project

P
Paul Ross 👤 Member for 23 years
START Date
END Date

The existing programme had some spurious link as the order of works had been dragged from an existing resourced programme, I sorted out the order and linking, and submitted this to VL for consideration, after 3 iterations this was submitted to their Client. The initial plan was for me to update this over several months, however this request was never made by VL