Bid/Project Planning Engineer

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.

Bid/Project Planning Engineer, Bam Nuttall, Various

START Date

Planning Engineer Bam Nuttall

Based at Northwich office

Producing progrmmes for tenders containing all the relevant detail as a contract requirement. Assessing optimum phasing and developing methodology as a result of knowledge gained from the requirements within the tender documents and drawings.

Bid/Project Planning Engineer, BK Gulf, Dubai International Airport Expansion Project Phase – II

P
Prem Ananth 👤 Member for 12 years 11 months
START Date
  • Develop realistic programs up to Work Breakdown Structure level IV
  • Produce Master procurement schedule / drawing schedules / Material submittal registers / Work inspection registers
  • Resource / Cost loading & Tracking
  • Leveling resources to achieve maximize productivity
  • Develop Manpower Histogram and resources forecast curves.
  • Knowledge in FIDIC clauses
  • Able to handle Civil / Fit-out Works
  • Track and report progress achieved on bi-weekly / monthly basis
  • Attend Progress review meetings with client / consu

Bid/Project Planning Engineer, Al Ghafly General Contracting, Teachers Housing, SAS Al Nakhel 483 VIllas

P
Prem Ananth 👤 Member for 12 years 11 months
START Date
END Date

Planning Engineer - Construction Projects - Mechanical, Electrical & Plumbing

 

       My duties & responsibilities are enlisted below and are not limited;

       1. Prepare Base line program according to contract conditions / Bill of quantity / Drawings Etc.

       2.

Bid/Project Planning Engineer, Abir Infrastructure Pvt. Ltd., 1750 MW Demwe Lower Hydro Electric Project, India

START Date
END Date
  • Project Planning and Schedule for a Hydro electric Project 
  • Constructional Power Planning & Costing 
  • Planning of the communication systems for a remote location 
  • Planning of the automation of the work and a centralized sub station to monitor the resources(equipment, vehicles, manpower, stores etc.,). 
  • Insurance claims 
  • Project monitoring for a transmission line 
  • Planning of the equipment in respect to power generation and the related equipments along with their automation. 
  • Conveying systems

Bid/Project Planning Engineer, Abir Infrastructure Pvt. Ltd., 1750 MW Demwe Lower Hydro Electric Project, India

START Date
END Date
  • Project Planning and Schedule for a Hydro electric Project 
  • Constructional Power Planning & Costing 
  • Planning of the communication systems for a remote location 
  • Planning of the automation of the work and a centralized sub station to monitor the resources(equipment, vehicles, manpower, stores etc.,). 
  • Insurance claims 
  • Project monitoring for a transmission line 
  • Planning of the equipment in respect to power generation and the related equipments along with their automation. 
  • Conveying systems

Bid/Project Planning Engineer, BNFL (Sellafield Sites), Nuclear

START Date
END Date
  • Planning Engineer Roles and Responsibilities 2010/2013
  • Working on Major Projects within the Business
  • Using Primavera to carrying out the Planning applications required for the Project:
  • Develop the Project Programme
  • Develop the Work Breakdown Structure with Resources and Cost ]
  • Monitor, Control and report on project progress
  • DV Cleared

Work Week Manager Roles and Resposibilities 2005/2010