Area Planning Engineer

Area Planning Engineer, Sinopec, SWCC

Z
zhang ting 👤 Member for 14 years 9 months
START Date

 

Ø  Developed detailed construction schedule (P3) with contractor based on the material delivery and shutdown logic,

Ø  Monitored construction schedule, daily progress report was prepared for updating management on progress

Ø  Interface with project site management and client counterparts, Organizing & attending progress meeting with client.

Area Planning Engineer, International Master, hospital-

START Date
END Date

Senior Planning Engineer

§Preparing Master Plan with realistic method of statement

§Preparing Detailed Contractor Construction Schedule

§Analyzing B.O.Q. for an effective cost loading

§Updating of schedule & monitoring the work progress

§Perform detailed analysis of the schedule updates

§Revising of schedule logic according to site condition

Area Planning Engineer., ARCHIRODON CONSTRUCTION OVERSEAS CO. (S.A.), Banha Power Station 750 MW

START Date
  • Contract Baseline (Resources, Materials, Equipment, Cost),
  • 4 Weeks Look Ahead Schedule,
  • 90 Days Look Ahead Schedule,
  • MTS (Material Tracking System),
  • TIA (Time Impact Analysis),
  • Productivity, Production Rates and
  • Cost Control.