glf Project Engineer

Port Everglades | 1849-1851 SE 27th St.| Hollywood, FL | 33136 USA



Seawall Stabilization Project at Port Everglades, FL – Contract Value $5M

Installation of approximately 950 feet of steel sheet pile and connecting to the existing anchor wall. Provide and install 40’X60’ pre-engineered steel storage building. Finally, installing 310 auger cast piles.



•     Prepared As Built Drawings

•     Schedule Update

•     Prepared Monthly Pay Application & Monthly Report

Archirodon Construction Overseas Senior Planner

Projects:

•Khalifa port marine project phase one(Client is ADPC - Bechtel)(UAE)(1.5 billion $).



Project Description:

This is an EPC project. This project is a consortium between three companies (Archirodon, Boskalis and Hyundai). The project is a construction of marine structures; Dredging and reclamation of marine port contain quay wall & causeway & Revetments & breakwater and three bridges.



Job Title:

•Senior Planning Engineer.



Job Responsibilities:

Freshfields Bruckhaus Deringer, Austria Forensic Planner

Expert Witness. Sewage Sludge Treatment Plant, Daldowie, Glasgow. Extension of Time claim. Instructed by Freshfields Bruckhaus Deringer Austria, lawyers for the respondent (JV contractor). Produced an expert report, attended meetings with claimant’s expert and prepared joint memorandum. The case settled prior to hearing expert evidence.