Planner / Project Manager (Dam project), Sepasad Co.;Sabir Co.;Ahab Co., Gotvand Dam,Germi-Cahi Dam,Jareh Dam

START Date

Planner, Scheduler, Resource Analyzer, Process analyzer, Project Controller, Procurement analyzer,

Activity Size Calculator, Structure 3D Modeling, Contactors Superviser and .... . 

Dhandayuthapani Dhayalan

First Name
Dhandayuthapani
Last Name
Dhayalan
Professional Since
Years Experience
0
Telephone Number
+97474485107
LinkedIn Profile
www.linkedin.com/in/dhandayuthapani-dhayalan-5885351b

Project Manager with over 12 years of experience managing multi-million dollar construction projects, coordinating workforce team of subcontractors, a

Planning and Project Control, Vianini Group, Hydraulic Complex - Rock Dam

START Date
END Date

Planner and Project control. Rock dam on the River Kwai equipped with two diversion tunnels, penstocks, turbines, and the point of generation and transfor-mation equipment. I had experience in all areas of project management disciplines. Main concentration: cost engineering, planning, production control, rela-tions with public authorities.

Off-shore dept.head, Gruppo Condotte d'Acqua, Commercial harbour and oil terminals

START Date
END Date

Off-Shore Head Dept. Commercial port including oil terminals. I was offshore works department head. My duty was also to look after the oceanographic laboratories and to develop software for the analysis of industrial costs and produc-tion control.

Planning & Programming Officer / Proposal Officer, Energy Company Limited - TAACA (Affiliated company by Energy Resources Development Co. Ltd. – TAACA), Upgrading for SWPH-Pump & Traveling Water Screen at Yanbu, Construction of Infrastructure for Air Defe

START Date
END Date

As aPlanning & Programming Officer, Operations Department

Job Description:

  • Prepare a monthly project management team (PMT) report with incorporating EPC contractor report’s consisting of: Design engineering deliverables list status, Procurement activities information, Construction progress status and planned schedule and forecast, areas of concern, overall manpower deployment status, current construction materials and equipment deployment status, EPC percentage

Risk and Planning Manager, Buro Happold, Kingdom of Saudi Arabia (2009 – 2010), Wadi Al-Asla

START Date
END Date

This project involved the preparation of an Integrated Development Plan (IDP) for a high profile site on the outskirts of Jeddah. The site incorporates 5 individual land parcels totalling 120km2.

Sr. Planning Engineer, ACWA Emirates L.L.C., Dubai, U.A.E. (part of Consolidated Contractors Company CCC Group), Engineering Procurement Construction Contract for (02) Reverse Osmosis Sea Water Desalination plants at the Palm Jumeirah Island

I
Ibad Ghani 👤 Member for 21 years 9 months
START Date
END Date
  • Baseline ScheduleDevelopment& Control to ensure proper Scope/ Integration/ TimeManagement of the project in Coordination with Projects Manager, Consultant / Client / Sub-Contractors & Vendors at all levels.
  • Recovery Programmes (Up to required levels).
  • Progress Monitoring, Updating Schedules, Computing Variance and suggesting remedial actions.
  • Implementation of Project Control Procedures.
  • Generation / Updating of Progress S-Curves.
  • Procurement planning including long lead items.
  • Enterprise Resource P