Water / Utilities

Senior Planning Engineer, Brown & Root Vickers, Great Man-made River

G
Gordon Hall 👤 Member for 22 years 3 months
START Date
END Date

This project is one of the largest civil engineering projects undertaken in the world.  The concept is to take potable water from two aquifer fields in Tazerbo and Sarir, 1000km south of Ajdabiya, via a 4.3m diameter concrete pipeline from each to firstly a mixing reservoir in Ajdabiya, and from there by two separate lines, one to Benghazi and the other along the coastal plain to Sirte.  The 4.3m diameter pipeline was manufactured in 4.5m length sections, in two strategically placed plants constructed for the purpose, and shipped along dedicated haul roads constructed and maintain

Project Planner, John Holland Pty Ltd, Sugarloaf pipeline, VIC

START Date
END Date

This role required me to step-up a gear in programme development, the co-ordination / integration of various parties and the collection and presentation of project schedule related information. Coming from a predominately claims background, an Alliance seemed a little foreign. Although design was on-going and changing throughout construction the same date for practical completion remained and thus the programme was highly dynamic.

Planning & Cost Control Manager, Dongho Korean Saudi Limited Company, Riyadh National Water Company Projects

START Date

Currently the Planning/Cost Control Manager for Dongho Korean Saudi Limited Co. under Al Bayan Holding Groups Middle East responsible for the company’s regional strategic development management and heads up the planning, programming and controls department and functional oversight of the Bids/Tendering and communication division.

Construction Project Planner, Barhale , Yorkshire Water

S
Sarah Field 👤 Member for 15 years 11 months
START Date

Project Planner - Sewer Rehab schemes since November 2010. Set up of programmes to allow compliancy to Client requirements. Cost allocation and review. Update with Earned Value Analysis and Critical Path Analysis. Report submission  to Client. Project Progress Meetings. Liaison with design and site teams. Use of P6 and MSP

Project Planner - Rail - Structures Framework. As above. July 2007 - Nov 2010

Project Controls Asst - Water - Use of P3e. July 2006 - July 2007