Client side senior planner, MACE GROUP LIMITED, Irish Water Capital Delivery Programme
2017 – 2018 Lead PMO Planning and Controls specialist on the €100m National Telemetry Programme at Irish Water. Role was to design and implement improved PMO Processes and Tools for planning and reporting (using MS Project 2013 and Power BI), Document Control (SharePoint), RAID Management, Change Control and Cost Management. Circa 3,000 Activities planned to deliver a range of IT and OT Projects over a 5-year period.
Mumta Ladwa
I joined National Grid in 2012, and moved to Project Controls to work as a PA in 2014. In 2017 I was promoted to Project Controls Officer, and produced a number of project reports. In 2018 my role changed to produce executive reports, as one of my strengths is writing. I enjoy the stakeholder management and engagement, liaising with a number of people within the team and outside of the department. I am trusted to handle confidential data, and enjoy working to deadlines.
Project Controls Officer, National Grid, N/A
Project Controls Officer
This role primarily involves the production of a range of executive reports on behalf of Ian Cartwright, Capital Delivery Director. The reports are:
1. Exec Headlines (produced monthly for Nicola Shaw, UK Executive Director)
2. Monthly Performance Report (produced monthly for Alan Foster, UK Chief Finance Officer)
3. Capital Delivery Scorecard (produced monthly, incorporated into the MPR)
4. Quarterly Performance Review (produced quarterly for Nicola Shaw, UK Executive Director)
Contracts Senior Planning Engineer, Galliford Costain Atkins JV, Liverpool WWTW
Senior Planning Engineer Liverpool Waste Water Treatment Works. Involved in many aspects of this £180m project. I had (and still do have ) a particular interest in developing programmes from scratch for process plant, HV transformer swap outs, large 500kW pump changes and software development for many control systems. SCADA
Contracts Senior Planning Engineer, Galliford Costain Atkins JV, Liverpool WWTW
Senior Planning Engineer Liverpool Waste Water Treatment Works. Involved in many aspects of this £180m project. I had (and still do have ) a particular interest in developing programmes from scratch for process plant, HV transformer swap outs, large 500kW pump changes and software development for many control systems. SCADA
Hilal Al Rashdi
- Using Microsoft Office (including Word, Excel, and PowerPoint)
- Optimizing a certain process to reduce the capital costs and to achieve high quality products.
- Solving design problems and design a large scale chemical process.
Engineer / Project Engineer, Oman Power and Water Procurement Company, Barka IWP, Ibri IPP and Qurayyat IWP
- Monitor prject progress and HSE requirments
- Producing status reports to different level of management.
- Meeting with various stakeholders.
- Drafting emails, letters.
- HSE site inspections.
- Application of project managment knowledge areas.
- Status presentations and process improvements.
- witnessing acceptance test, monitoring observation list and calims managments.
RASHID ASHRAF
CORE COMPETENCIES
- Primavera Project Planner Vr.6.1, 5.0, 3.1
- Microsoft Office Suite Package 2013
- Microsoft Project 2013
- Safran Planner
- SAP R/3 Module System (PMS, MMS)
- Project performance & control analysis
- Maximo (CMMS System)
- Earned Value analysis & KPI’s
- Recruitment / Training & Staff
- Bidding and Contracts Management
- Advanced reporting
Maintenance Planner, Qatar District Cooling Company, Utility Industry
- Develop and maintain Maintenance Plans & schedules at various phases of QDC Plants Facilities, Plant Shutdown, progress reviews and preparation of planning reports.
- Collect CMMS notifications and job cards; create maintenance order and plan, assigning resources and spares
- Review and develop daily maintenance schedules and validate the work orders are scheduled according to their priorities , handling number of work orders and with resources availability
- Obtain material, spares, services requirement from maintenance section and prepare scope of work, specifications, code number.