Professional Engineer, Professional, Italy - Various Projects
Technical office – Infrastructure Engineer
- Designing and project control of infrastructure projects average annual budget 10M€.
Technical office – Infrastructure Engineer
- Designing and project control of infrastructure projects average annual budget 10M€.
Project Control Manager
project: Passante di Mestre S.C.p.A. ANAS
General Contractor design and build 33km motorway, 840M€.
- Analyzing, defining and implementing planning and cost control methodologies.
- Organizing and running Project Management Office and Project IT Services department.
- Defining and maintaining project data structures: EPS, PBS, WBS, OBS, CAPs.
- Monthly progress construction reports submitted to the Client.
A civil Engineer working in the Construction / Projects Control Industry.
I have been active in Monitoring construction projects which include Residential & Commercial Buildings, Multi Storeyed Towers, as well as Roads, Bridges & Infrastructure Projects.
My Experience also includes, Estimation of civil works & Preparing tender schedules for Tender submission.
Monitoring Roads & Bridge Project.
Progress measurement, Update and Analyse the progress.
Preparing KPI for Key Items.
Preparing Schedules, Manpower Histogram, Progress S Curve & Cash flow for Tenders.
Re-assigned to the project to assist the lead planner with progress updates and reporting requirements of the detailed engineering and execution phases of the project. Ensure that the Fluor planning and scheduling procedures are followed and the progress systems are maintained and up to date. Tender schedule evaluations. Master schedule qualitative and quantitative risk analysis to determine schedule contingency. Ensure that planning gate review requirements are met. Early works gate review successfully passed.
Develop and resource project execution schedule. Develop project schedule and progress reports. Develop master schedule basis of schedule document. Project setup.
Hands on planning role in both UK and Canada in project and bid environments. Team management responsibility.
I have only listed the job experience where I was lead planner. Both in this post, but in earlier posts.
2001 to present
General Manager for Virgin Islands Paving, Inc
Aside from being General Manager, I am also the dedicated Scheduler
Used Primavera Contractor until P6.21 and now use P6.71
Most of the scheduling is resource driven and the Primavera Document Library is extensive.
I have streamlined the submittal process and time sheets.
Responsible for the maintenance and progress reporting of agreed programmes, contract surveillance and performance of Contracor and Sub-Contracter against aggreed programmes.