Roads / Tunnel / Bridge

Senior Planner, CLM Delivery Partner, London 2012 Olympics Project

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
750
Experience Hours (Forensic Analysis)
1250

I worked as the sole planner looking after are the design & installation of the 11kV  Distribution Network (currently in the construction phase) & Low Voltage Distribution Networks  installation (currently in the design phase), for the whole of the Olympic Park. I later picked up the existing Heating & Cooling Network Distribution for the whole of the Olympic Park.

Lead Planner, Dar Handasah, Arriyadh Bus Rapid Transport - Phases 1 - 3

START Date
END Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
1500
Experience Hours (Forensic Analysis)
1000

Lead Planner - Bus Rapid Transport / Riyadh Metro - (SAR 4.3B)

Key Responsibilities:

·         Ensure the Contractor is maintaining all planning policies and procedures

·         Advising ADA-SM on all issues that might impact programme dates.

Deputy Manager, Euphoria Engineering Solutions Pvt Ltd, Teesta Stage 3 Hydro Electric Project

START Date
END Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Cost Management)
4500
Experience Hours (Forensic Analysis)
200

Construction of Intermediate Adit (7.5m Dia.) to Diversion Tunnel of 11.5m dia. With
Horseshoe shape in 1200 MW Teesta Stage III HEP under SEW Infrastructure Ltd, using
Heading & Benching + Kerb Concreting + Overt concrete /Gantry.

Construction of two testing tunnels (150m & 330m long) at dam site (2.25 m dia.) as Site
In charge in 300MW Panan H.E.P.

Machinery, Material & Manpower Planning with Execution for the Bunker Tunnels of size
6m x 5.5m dia of various lengths for Defence in North Sikkim @ 15050 FT elevation.

Senior Engineer (Assistant Project Manager), T K Engineering Consortium Pvt Ltd, Mechukha ALG

START Date
END Date
Experience Hours (Planning & Scheduling)
500
Experience Hours (Cost Management)
1200
Experience Hours (Forensic Analysis)
50
  • Client: - NCC Ltd (Project Owner: - M.E.S.)
  • Machinery, Manpower & Material planning along with the execution of Mechukha ALG, West Siang, Arunachal
  • Efficient operation of 150 TPH Terex Mobile Crusher Plant, 100 TPH WMM Plant & 30 Cum/hr Schwing Batching Plant.
  • Executed preparation of Subgrade, GSB, WMM, DLC for 46m wide and 1.36KM long Runway & 3 Km long Periphery road for the runway.

Ernesto Montales

First Name
Ernesto
Last Name
Montales
Professional Since
Oldest experience
Years Experience
21
Guild Accreditation
GPC Member
Telephone Number
+447738324252
LinkedIn Profile
https://www.linkedin.com/in/ernestomontales/

I’m a Project Planning and Controls Consultant with a passion for helping Project Managers and its team for better understanding (for better delivery of Projects) of the programme by encouraged participation in the planning process therefore having a sense of ownership and by translating the programme to a more user friendly document.

Lead Planner, Schofield Lothian, Brent Cross Re-development Phase 1AN

START Date
Experience Hours (Planning & Scheduling)
500

Schofield Lothian – September 2017 to PresentLead\Senior Project Planner - Brent Cross Redevelopment Phase 1AN (Infrastructure)Project Cost: £400m • Leading and facilitating the development and maintenance of the master project plan for the project • Providing advice on different approaches that can be adopted in order to successfully achieve the client’s overall objectives•

fdfgd, wdefdfdf, wdxx

START Date
END Date
Experience Hours (Planning & Scheduling)
100
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
150

dadas asasa qesf xadsf hgdfe wewew frtyr ewewwtrtr retryrg tfrfrgyrt erefg hththt efadsgrhggsfg fgdsgfeg

2 x Planners / Senior Planners needed for Denmark role, FABTECH WORKS & CONSTRUCTION LIMITED, %26 Oil %26 Gas Projects Infrastructurus Storage tanks

START Date
END Date
Experience Hours (Planning & Scheduling)
550
Experience Hours (Cost Management)
300
Experience Hours (Forensic Analysis)
600

bjb juu uju ju ju ju j uj u ju j u ju j u j uj u j u j u ju j u j u u  k u ku  

Dipayan Saha

First Name
Dipayan
Last Name
Saha
Professional Since
Years Experience
0
Telephone Number
9804758620
LinkedIn Profile
dipayansaha91

Primavera-P6 8.2, MS Project, MS Office, Planning, Monitoring